Electric generating plantEIA plant no. 56972

Pacific Canyon Windfarm LLC

Type
Onshore Wind Turbine
Nameplate capacity
8.3 MW
Units
1
In service since
2009
Operator
Echo 1
Location
Echo, Morrow County, Oregon
Rated 146th largest in Oregon · 6624th of 14,761 in the U.S. · by nameplate

Pacific Canyon Windfarm LLC is a wind power plant in Oregon with a nameplate capacity of 8.3 MW. It generates roughly 16.0k MWh per year — enough to power about 1,528 average U.S. homes.

Its capacity factor of 22% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Pacific Canyon Windfarm LLC could make 72.7k MWh. In 2023 it made 16.0k MWh — the same as running at full power 22 hours in every 100.

Nameplate, full year72.7k MWh8.3 MW × 8,760 hours
Actually generated16.0k MWhEPA eGRID, 2023 · ≈1,528 homes

Peaking or variableCapacity factor 22%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricWindSolarBiomass

Location

Address28821 Madison Road
CityEcho
CountyMorrow County
StateOregon
ZIP97826
Coordinates45.65420, -119.48690
OperatorEcho 1

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
1Onshore Wind TurbineWind8.3 MWOperating2009

Grid context

NERC RegionWECC
Balancing AuthorityPacifiCorp - West

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Morrow County

View all plants in Morrow County →

Data centers near Pacific Canyon Windfarm LLC

Data centerOperatorDistance
Amazon Web Services data center, BoardmanAmazon Web Services13.4 mi
Amazon Web Services data center, BoardmanAmazon Web Services15.3 mi
Amazon Web Services data center, BoardmanAmazon Web Services16.0 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more