Amazon Web Services data center, Boardman

Amazon Web Services data center, Boardman is a data center in Boardman, Morrow County, Oregon. It is mapped as 7 buildings covering about 16.7 acres (729,000 sq ft). Its power comes off the Northwest grid (PacifiCorp West), which runs on 39% hydroelectric, 25% natural gas and 16% coal.

OperatorAmazon Web Servicesas mapped
Roof area17 ac7 buildings
Grid CO₂631 lbper MWh, NWPP region
Nearest plant1.0 miCoyote Springs

Location

This data centerOther data centersPower plants (colored by fuel)

AddressRippee Road, Boardman OR 97818
CountyMorrow County, Oregon
Coordinates45.84095, -119.65577
On OpenStreetMapway/460070144, way/592171280, way/633034071, way/633034074, way/697415321, way/1252196819 and 1 more

What powers Amazon Web Services data center, Boardman

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Northwest grid region, and the county's largest utility is on the PacifiCorp West grid. In 2023, the region's electricity was 39% hydroelectric, 25% natural gas, 16% coal and 12% wind.

Each megawatt-hour carried about 631 lb of CO₂, 18% cleaner than the U.S. grid as a whole (765 lb).

Hydroelectric 39%Natural Gas 25%Coal 16%Wind 12%Solar 3%Nuclear 3%

Share of electricity generated in EPA's Northwest grid region (NWPP) in 2023, from eGRID. 269 TWh from 808 plants.

Utilities that serve Morrow County

UtilityTypeGridBusiness rateIndustrial rate
PacifiCorpInvestor OwnedPacifiCorp West10.6¢10.1¢
Umatilla Electric Coop AssnCooperativeBonneville Power Administration6.9¢6.0¢
Bonneville Power AdministrationFederalBonneville Power Administration4.2¢—

Utilities that report serving Morrow County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Coyote SpringsNatural Gas296 MW1.0 mi
Coyote Springs IINatural Gas287 MW1.0 mi
Tower Solar, LLCSolar120 MW7.0 mi
Finley Buttes Landfill GasBiomass4.8 MW10.7 mi
Carty Generating StationNatural Gas500 MW12.4 mi
Four Corners Windfarm LLCWind8.0 MW13.8 mi
Hermiston Generating PlantNatural Gas621 MW14.0 mi
Butter Creek Power LLCWind5.0 MW14.8 mi
Oregon Trail Windfarm LLCWind9.9 MW15.0 mi
Pacific Canyon Windfarm LLCWind8.3 MW15.3 mi

The largest power plant within 50 miles is Columbia Generating Station, a 1,200 MW nuclear plant 46 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Amazon Web Services data center, BoardmanAmazon Web Services34 ac1.7 mi
Amazon Web Services data center, BoardmanAmazon Web Services19 ac1.8 mi
Amazon Web Services data center, BoardmanAmazon Web Services19 ac1.8 mi
Amazon Web Services data center, BoardmanAmazon Web Services30 ac2.5 mi
Amazon Web Services data center, BoardmanAmazon Web Services9.8 ac2.8 mi

More

Data centers in Oregon · Data centers in Morrow County · All Amazon Web Services data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me