Electric generating plantEIA plant no. 61773

Palmas Wind, LLC

Type
Onshore Wind Turbine
Nameplate capacity
145 MW
Units
1
In service since
2020
Operator
Acciona Energy USA Global, LLC
Location
Rio Hondo, Cameron County, Texas
Rated 478th largest in Texas · 2215th of 14,761 in the U.S. · by nameplate

Palmas Wind, LLC is a wind power plant in Texas with a nameplate capacity of 145 MW. It generates roughly 352.8k MWh per year — enough to power about 33,600 average U.S. homes.

Its capacity factor of 28% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Palmas Wind, LLC could make 1.3M MWh. In 2023 it made 352.8k MWh — the same as running at full power 28 hours in every 100.

Nameplate, full year1.3M MWh145 MW × 8,760 hours
Actually generated352.8k MWhEPA eGRID, 2023 · ≈33,600 homes

Peaking or variableCapacity factor 28%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilWindSolarBattery Storage

Location

Address18551 Olimito North Rd
CityRio Hondo
CountyCameron County
StateTexas
ZIP78583
Coordinates26.28889, -97.49639
OperatorAcciona Energy USA Global, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
PWOnshore Wind TurbineWind145 MWOperating2020

Grid context

NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc.

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Cameron County

View all plants in Cameron County →