Power Plants in Cameron County, Texas

Cameron County, Texas has 23 power plants totaling 1,561 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.

Plants23operating sites
Capacity1,561 MWnameplate
Generation2.6M MWhannual
CO₂94.5kmetric tons/year
Wind 65%Solar 12%Battery Storage 10%Natural Gas 9%Oil 2%

Plant locations

All plants in this county

PlantCityFuelNameplate capacityOperator
Los Vientos Wind 1BSebastianWind202 MWDeriva Energy
Los Vientos Wind 1ASebastianWind200 MWDeriva Energy
La Chalupa, LLCRio HondoWind199 MWAcciona Energy USA Global, LLC
Cameron Wind 1 LLCRio HondoWind181 MWCameron Wind 1 LLC
Palmas Wind, LLCRio HondoWind145 MWAcciona Energy USA Global, LLC
Silas RayBrownsvilleNatural Gas143 MWBrownsville Public Utilities Board
Nebula SolarLa FeriaSolar135 MWRayos del Sol Solar Project, LLC
Citrus Flatts Energy Center, LLCHarlingenBattery Storage100 MWEast Point Energy, LLC
San Roman Wind I, LLCLos FresnosWind95.3 MWAcciona Energy USA Global, LLC
Vancourt Solar InterconnectionsLa FeriaSolar45.0 MWRayos del Sol Solar Project, LLC
Mesquite Clean Energy Center (BESS)La FeriaBattery Storage10.1 MWOn Energy Storage
SMT Santa Rosa LLCSanta RosaOther Fossil10.0 MWSMT Santa Rosa LLC
SMT Los Fresnos LLCLos FresnosOther Fossil10.0 MWSMT Los Fresnos LLC
SMT Harlingen II LLCHarlingenOther Fossil10.0 MWSMT Harlingen II LLC
BESS La FeriaLa FeriaBattery Storage10.0 MWGrenergy USA LLC
Aggreko MSR Grid PC5HarlingenBattery Storage10.0 MWAets Am LLC
Aggreko MSR Grid PC7BrownsvilleBattery Storage10.0 MWAets Am LLC
Regis LaurelesSan BenitoBattery Storage9.9 MWRegis Laureles LLC
E. Porte Ct.HarlingenOil9.0 MWPower Depot Group A, LLC
Santa RosaSanta RosaOil9.0 MWPower Depot Group A, LLC
VaqueroHarlingenOil9.0 MWPower Depot Group A, LLC
Villa CavasosBrownsvilleOil9.0 MWPower Depot Group A, LLC
Wal456BrownsvilleNatural Gas1.2 MWWalmart Stores Texas, LLC

About power generation in Cameron County

Cameron County, Texas has 23 power plants totaling 1,561 MW of nameplate capacity. Wind is the dominant fuel source at 65% of installed capacity, followed by Solar (12%) and Battery Storage (10%). The largest facility is Los Vientos Wind 1B at 201 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.

To find plants closer to a specific address in Cameron County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.