Electric generating plantEIA plant no. 10800

Pelzer Lower

Type
Conventional Hydroelectric
Nameplate capacity
3.3 MW
Units
1
In service since
1989
Operator
Central Rivers Power US, LLC
Location
Williamston, Anderson County, South Carolina
Rated 138th largest in South Carolina · 9699th of 14,761 in the U.S. · by nameplate

Pelzer Lower is a hydroelectric power plant in South Carolina with a nameplate capacity of 3.3 MW. It generates roughly 4.6k MWh per year — enough to power about 438 average U.S. homes.

Its capacity factor of 16% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Pelzer Lower could make 28.9k MWh. In 2023 it made 4.6k MWh — the same as running at full power 16 hours in every 100.

Nameplate, full year28.9k MWh3.3 MW × 8,760 hours
Actually generated4.6k MWhEPA eGRID, 2023 · ≈438 homes

Peaking or variableCapacity factor 16%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A hydroelectric plant

1reservoir behind the dam2penstock3turbine + generator4water returns to the river
  1. A dam holds water back, building up height — the “head”.
  2. Water drops through a pipe called a penstock.
  3. It spins a turbine at the bottom, which turns a generator.
  4. The water flows out below the dam and back into the river.

Why the numbers look like this: output depends on how far the water falls and how much of it flows, so a hydro plant's year follows rain and snowmelt — and dam operators can hold water back for the hours when power is worth the most.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilHydroelectricSolarBiomass

Location

Address900 Dunlap Road
CityWilliamston
CountyAnderson County
StateSouth Carolina
ZIP29627
Coordinates34.61652, -82.44791
OperatorCentral Rivers Power US, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
GEN1Conventional HydroelectricWater3.3 MWOperating1989

Grid context

NERC RegionSERC
Balancing AuthorityDuke Energy Carolinas

About Hydroelectric plants

Hydroelectric plants spin turbines using falling or flowing water — typically from a dam-impounded reservoir. They are dispatchable, long-lived, and emission-free at the point of generation, though large reservoirs can disrupt rivers and ecosystems and methane can be released from flooded vegetation.

Other plants in Anderson County

View all plants in Anderson County →

Explore more