Electric generating plantEIA plant no. 10799

Pelzer Upper

Type
Conventional Hydroelectric
Nameplate capacity
2.0 MW
Units
1
In service since
1989
Operator
Central Rivers Power US, LLC
Location
Petzer, Anderson County, South Carolina
Rated 151st largest in South Carolina · 11103rd of 14,761 in the U.S. · by nameplate

Pelzer Upper is a hydroelectric power plant in South Carolina with a nameplate capacity of 2.0 MW. It generates roughly 4.6k MWh per year — enough to power about 438 average U.S. homes.

Its capacity factor of 26% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Pelzer Upper could make 17.5k MWh. In 2023 it made 4.6k MWh — the same as running at full power 26 hours in every 100.

Nameplate, full year17.5k MWh2.0 MW × 8,760 hours
Actually generated4.6k MWhEPA eGRID, 2023 · ≈438 homes

Peaking or variableCapacity factor 26%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A hydroelectric plant

1reservoir behind the dam2penstock3turbine + generator4water returns to the river
  1. A dam holds water back, building up height — the “head”.
  2. Water drops through a pipe called a penstock.
  3. It spins a turbine at the bottom, which turns a generator.
  4. The water flows out below the dam and back into the river.

Why the numbers look like this: output depends on how far the water falls and how much of it flows, so a hydro plant's year follows rain and snowmelt — and dam operators can hold water back for the hours when power is worth the most.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilHydroelectricSolarBiomass

Location

AddressLebby Street
CityPetzer
CountyAnderson County
StateSouth Carolina
ZIP29669
Coordinates34.64237, -82.45444
OperatorCentral Rivers Power US, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
GEN1Conventional HydroelectricWater2.0 MWOperating1989

Grid context

NERC RegionSERC
Balancing AuthorityDuke Energy Carolinas

About Hydroelectric plants

Hydroelectric plants spin turbines using falling or flowing water — typically from a dam-impounded reservoir. They are dispatchable, long-lived, and emission-free at the point of generation, though large reservoirs can disrupt rivers and ecosystems and methane can be released from flooded vegetation.

Other plants in Anderson County

View all plants in Anderson County →

Data centers near Pelzer Upper

Data centerOperatorDistance
DartPoints GreenvilleDartPoints13.0 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more