Pine Tree Acres WM LFGTE is a biomass power plant in Michigan with a nameplate capacity of 12.8 MW. It generates roughly 76.5k MWh per year — enough to power about 7,284 average U.S. homes.
Its capacity factor of 68% puts it in the middle range — running steadily but not full-time.
Run flat out every hour of the year, Pine Tree Acres WM LFGTE could make 112.1k MWh. In 2023 it made 76.5k MWh — the same as running at full power 68 hours in every 100.
Mid-meritCapacity factor 68%. It runs much of the time, but not all of it.
How it works
Why the numbers look like this: engines start in minutes and come in small blocks, so they show up at landfills, on islands and as backup or peaking units — places that need power in small, fast pieces.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 36600 29 Mile Road |
|---|---|
| City | Lenox |
| County | Macomb County |
| State | Michigan |
| ZIP | 48048 |
| Coordinates | 42.76500, -82.74555 |
| Operator | WM Renewable Energy LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| GEN1 | Landfill Gas | Landfill Gas | 1.6 MW | Operating | 2012 |
| GEN2 | Landfill Gas | Landfill Gas | 1.6 MW | Operating | 2012 |
| GEN3 | Landfill Gas | Landfill Gas | 1.6 MW | Operating | 2012 |
| GEN4 | Landfill Gas | Landfill Gas | 1.6 MW | Operating | 2012 |
| GEN5 | Landfill Gas | Landfill Gas | 1.6 MW | Operating | 2012 |
| GEN6 | Landfill Gas | Landfill Gas | 1.6 MW | Operating | 2012 |
| GEN7 | Landfill Gas | Landfill Gas | 1.6 MW | Operating | 2012 |
| GEN8 | Landfill Gas | Landfill Gas | 1.6 MW | Operating | 2012 |
| SO₂ | 15 metric tons |
|---|
Annual totals and CO₂ rate reported by EPA eGRID for 2023. Reference averages are approximate U.S.-wide figures from the same dataset.
| NERC Region | RFC |
|---|---|
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. |
Biomass plants burn wood, agricultural waste, or methane from landfills to generate steam and electricity. They are considered carbon-neutral over long timescales when fuel is sustainably sourced, but they produce particulate emissions similar to coal.