Chick-fil-A Hiring Center

Chick-fil-A Hiring Center is a data center run by Dennis Sampier in Clinton Township, Macomb County, Michigan. Its power comes off the Michigan grid (MISO (Midcontinent ISO)), which runs on 49% natural gas, 25% coal and 10% nuclear.

OperatorDennis Sampieras mapped
Grid CO₂962 lbper MWh, RFCM region
Nearest plant12.6 miNortheast (MI)

Location

This data centerOther data centersPower plants (colored by fuel)

CountyMacomb County, Michigan
Coordinates42.62794, -82.98839
On OpenStreetMapnode/8641856300

What powers Chick-fil-A Hiring Center

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Michigan grid region, and the county's largest utility is on the MISO (Midcontinent ISO) grid. In 2023, the region's electricity was 49% natural gas, 25% coal, 10% nuclear and 9% wind.

Each megawatt-hour carried about 962 lb of CO₂, 26% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Natural Gas 49%Coal 25%Nuclear 10%Wind 9%

Share of electricity generated in EPA's Michigan grid region (RFCM) in 2023, from eGRID. 92.4 TWh from 221 plants.

Utilities that serve Macomb County

UtilityTypeGridBusiness rateIndustrial rate
DTE Electric CompanyInvestor OwnedMISO (Midcontinent ISO)14.2¢8.4¢

Utilities that report serving Macomb County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Northeast (MI)Natural Gas114 MW12.6 mi
Eagle Valley (MI)Biomass3.2 MW15.4 mi
Pine Tree AcresBiomass8.8 MW15.5 mi
Pine Tree Acres WM LFGTEBiomass12.8 MW15.6 mi
O'Shea Solar FarmSolar2.0 MW20.4 mi
HancockNatural Gas122 MW23.7 mi
DelrayNatural Gas142 MW23.7 mi
Dearborn Industrial GenerationNatural Gas748 MW24.0 mi
Putnam (MI)Oil13.5 MW24.4 mi
Placid 12Oil13.5 MW24.5 mi

The largest power plant within 50 miles is Belle River, a 1,664 MW coal plant 27 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

More

Data centers in Michigan · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me