Electric generating plantEIA plant no. 1737

Placid 12

Type
Petroleum Liquids
Nameplate capacity
13.5 MW
Units
5
In service since
1970
Operator
DTE Electric Company
Location
Clarkston, Oakland County, Michigan
Rated 148th largest in Michigan · 5674th of 14,761 in the U.S. · by nameplate

Placid 12 is a oil power plant in Michigan with a nameplate capacity of 13.5 MW.

The 13.5 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A reciprocating-engine plant

oil1pistons fire like a car engine2generator
  1. oil burns in cylinders, driving pistons — the same principle as a truck engine, much larger.
  2. The crankshaft turns a generator.
  3. Plants are built from several identical engines, so they can run one at a time or all together.

Why the numbers look like this: engines start in minutes and come in small blocks, so they show up at landfills, on islands and as backup or peaking units — places that need power in small, fast pieces.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilSolarBiomass

Location

Address4912 Edgar Rd
CityClarkston
CountyOakland County
StateMichigan
ZIP48346
Coordinates42.71060, -83.45690
OperatorDTE Electric Company

Generators (5)

IDTechnologyFuelNameplate capacityStatusOnline
1Petroleum LiquidsDistillate Oil2.7 MWOperating1970
2Petroleum LiquidsDistillate Oil2.7 MWOperating1970
3Petroleum LiquidsDistillate Oil2.7 MWOperating1970
4Petroleum LiquidsDistillate Oil2.7 MWOperating1970
5Petroleum LiquidsDistillate Oil2.7 MWOperating1970

Emissions (annual)

CO₂99 metric tons
NOₓ2 metric tons

Annual totals and CO₂ rate reported by EPA eGRID for 2023. Reference averages are approximate U.S.-wide figures from the same dataset.

Grid context

NERC RegionRFC
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc..

About Oil plants

Oil-fired plants typically run only during peak demand or grid emergencies because oil is expensive compared to gas and coal. Per megawatt-hour, they emit nearly as much CO₂ as coal.

Other plants in Oakland County

View all plants in Oakland County →

Data centers near Placid 12

Data centerOperatorDistance
Liberty Center OneNot recorded18.8 mi
Chick-fil-A Hiring CenterDennis Sampier24.5 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map