Q Plant is retired. EIA's monthly generator inventory (EIA-860M, September 2026) lists every generator at this natural gas plant as retired; the last one retired in April 2023. It is not counted among California's operating plants or in any ranking on this site.
The figures below describe the plant when it ran: equipment from EIA Form 860 (2025), output and emissions from EPA eGRID (2023).
Run flat out every hour of the year, Q Plant could make 40.3k MWh. In 2023 it made 10.1k MWh — the same as running at full power 25 hours in every 100.
Capacity factor 25% in 2023, before it retired.
How it works
Why the numbers look like this: a combustion turbine can go from cold to full power in well under an hour, often minutes, so grid operators call on these plants for the few hottest or coldest hours of the year. A low capacity factor here is the job description, not a failure.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 10190 McKellar Blvd |
|---|---|
| City | San Diego |
| County | San Diego County |
| State | California |
| ZIP | 92121 |
| Coordinates | 32.90417, -117.20111 |
| Operator | Qualcomm Incorporated |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| Q-TG1 | Natural Gas Fired Combustion Turbine | Natural Gas | 4.6 MW | Retired | 2013 |
| CO₂ | 3.2k metric tons |
|---|---|
| NOₓ | 9 metric tons |
| CO₂ Rate | 635 lb/MWh |
Annual totals and CO₂ rate reported by EPA eGRID for 2023. Reference averages are approximate U.S.-wide figures from the same dataset.
| NERC Region | WECC |
|---|---|
| Balancing Authority | California Independent System Operator |
Natural gas plants are the workhorse of the modern grid. Combined-cycle units achieve very high efficiency and can ramp up and down quickly to balance variable renewables. They emit roughly half the CO₂ per MWh of coal and far less of other pollutants, but they still release upstream methane during fuel extraction.