Scccd - Fresno Community College

☀ SolarIPP Non-CHP2 MW capacity

1320th largest plant in California · 10066th nationally

Scccd - Fresno Community College is a solar power plant in California with a nameplate capacity of 2.2 MW. It generates roughly 3.8k MWh per year — enough to power about 361 average U.S. homes.

Its capacity factor of 20% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%20%
Peaking — intermittent or backup
Capacity2 MWnameplate
Annual Generation3.8k MWhEPA eGRID
Capacity Factor20%of theoretical max
Annual CO₂metric tons

Location

Plant NameScccd - Fresno Community College
OperatorForefront Power, Llc
CityFresno
CountyFresno County
StateCalifornia
ZIP93741
Coordinates36.76655, -119.79858

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilHydroelectricSolarBiomassBattery Storage

Generators (1)

IDTechnologyFuelCapacityStatusOnline
231Solar PhotovoltaicSolar2.2 MWOperating2018

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Fresno County

View all plants in Fresno County →

Explore more