Electric generating plantEIA plant no. 66765

SCH County - (2B) 4982 Rynex Corners Rd

Type
Solar Photovoltaic
Nameplate capacity
5.0 MW
Units
2
In service since
2020
Operator
Distributed Solar Development, LLC
Location
Pattersonville, Schenectady County, New York
Rated 308th largest in New York · 7466th of 14,761 in the U.S. · by nameplate

SCH County - (2B) 4982 Rynex Corners Rd is a solar power plant in New York with a nameplate capacity of 5.0 MW. It generates roughly 3.2k MWh per year — enough to power about 305 average U.S. homes.

Its capacity factor of 7% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, SCH County - (2B) 4982 Rynex Corners Rd could make 43.8k MWh. In 2023 it made 3.2k MWh — the same as running at full power 7 hours in every 100.

Nameplate, full year43.8k MWh5.0 MW × 8,760 hours
Actually generated3.2k MWhEPA eGRID, 2023 · ≈305 homes

Peaking or variableCapacity factor 7%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A battery storage site

charge middaydischarge evening1battery containers2inverters, both ways3the grid
  1. Rows of shipping-container-sized battery racks store electricity chemically.
  2. Inverters charge them from the grid — often midday, when solar is plentiful and cheap.
  3. In the evening peak the same inverters run the other way and send power back.

Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Solar

Location

Address4982 Rynex Corners Rd
CityPattersonville
CountySchenectady County
StateNew York
ZIP12317
Coordinates42.88418, -74.08078
OperatorDistributed Solar Development, LLC

Generators (2)

IDTechnologyFuelNameplate capacityStatusOnline
3595Solar PhotovoltaicSolar2.5 MWOperating2020
3595BBatteriesBattery2.5 MWOperating2020

Grid context

NERC RegionNPCC
Balancing AuthorityNew York Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Schenectady County

View all plants in Schenectady County →

Explore more