Electric generating plantEIA plant no. 60391

SJA Solar LLC-Solterra Monastery CSG

Type
Solar Photovoltaic
Nameplate capacity
14.7 MW
Units
1
In service since
2016
Operator
SJA Solar, LLC
Location
Spencer, Worcester County, Massachusetts
Rated 50th largest in Massachusetts · 5590th of 14,761 in the U.S. · by nameplate

SJA Solar LLC-Solterra Monastery CSG is a solar power plant in Massachusetts with a nameplate capacity of 14.7 MW. It generates roughly 72.5k MWh per year — enough to power about 6,903 average U.S. homes.

Its capacity factor of 56% puts it in the middle range — running steadily but not full-time.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, SJA Solar LLC-Solterra Monastery CSG could make 128.8k MWh. In 2023 it made 72.5k MWh — the same as running at full power 56 hours in every 100.

Nameplate, full year128.8k MWh14.7 MW × 8,760 hours
Actually generated72.5k MWhEPA eGRID, 2023 · ≈6,903 homes

Mid-meritCapacity factor 56%. It runs much of the time, but not all of it.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

SolarBattery Storage

Location

Address11 Alta Crest Rd
CitySpencer
CountyWorcester County
StateMassachusetts
ZIP01562
Coordinates42.28344, -72.00847
OperatorSJA Solar, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
SJAPVSolar PhotovoltaicSolar14.7 MWOperating2016

Grid context

NERC RegionNPCC
Balancing AuthorityISO New England Inc.

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Worcester County

View all plants in Worcester County →

Explore more