Electric generating plantEIA plant no. 61048

Solar Star Oregon II

Type
Solar Photovoltaic
Nameplate capacity
56.3 MW
Units
1
In service since
2017
Operator
Avangrid Power LLC
Location
Prineville, Crook County, Oregon
Rated 55th largest in Oregon · 3788th of 14,761 in the U.S. · by nameplate

Solar Star Oregon II is a solar power plant in Oregon with a nameplate capacity of 56.3 MW. It generates roughly 116.0k MWh per year — enough to power about 11,045 average U.S. homes.

Its capacity factor of 24% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Solar Star Oregon II could make 493.2k MWh. In 2023 it made 116.0k MWh — the same as running at full power 24 hours in every 100.

Nameplate, full year493.2k MWh56.3 MW × 8,760 hours
Actually generated116.0k MWhEPA eGRID, 2023 · ≈11,045 homes

Peaking or variableCapacity factor 24%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

HydroelectricSolar

Location

Address12515 SW Millican Road
CityPrineville
CountyCrook County
StateOregon
ZIP97754
Coordinates44.18430, -120.91800
OperatorAvangrid Power LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
PV1Solar PhotovoltaicSolar56.3 MWOperating2017

Grid context

NERC RegionWECC
Balancing AuthorityPacifiCorp - West

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Crook County

View all plants in Crook County →

Data centers near Solar Star Oregon II

Data centerOperatorDistance
AppleApple Inc.7.5 mi
Meta data center, PrinevilleMeta8.1 mi
US Signal - OR01 BendUS Signal19.3 mi
Fort Rock DCFort Rock Data Center22.4 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more