Electric generating plantEIA plant no. 62732

Solar Star Palo Alto I, LLC

Type
Solar Photovoltaic
Nameplate capacity
1.3 MW
Units
1
In service since
2019
Operator
DG 1 Acquisition Co., LLC
Location
Palo Alto, Santa Clara County, California
Rated 1666th largest in California · 13237th of 14,761 in the U.S. · by nameplate

Solar Star Palo Alto I, LLC is a solar power plant in California with a nameplate capacity of 1.3 MW. It generates roughly 2.1k MWh per year — enough to power about 201 average U.S. homes.

Its capacity factor of 19% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Solar Star Palo Alto I, LLC could make 11.4k MWh. In 2023 it made 2.1k MWh — the same as running at full power 19 hours in every 100.

Nameplate, full year11.4k MWh1.3 MW × 8,760 hours
Actually generated2.1k MWhEPA eGRID, 2023 · ≈201 homes

Peaking or variableCapacity factor 19%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilSolarBiomass

Location

Address1501 Page Mill Road
CityPalo Alto
CountySanta Clara County
StateCalifornia
ZIP94304
Coordinates37.41101, -122.14886
OperatorDG 1 Acquisition Co., LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
SSPAISolar PhotovoltaicSolar1.3 MWOperating2019

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Santa Clara County

View all plants in Santa Clara County →

Data centers near Solar Star Palo Alto I, LLC

Data centerOperatorDistance
Northwest Data Center and Communications HubNot recorded2.3 mi
Equinix SV8Equinix2.5 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map