Sweet Tea Solar, Llc

☀ SolarIPP Non-CHP4 MW capacity

634th largest plant in North Carolina · 8126th nationally

Sweet Tea Solar, Llc is a solar power plant in North Carolina with a nameplate capacity of 4.5 MW. It generates roughly 6.2k MWh per year — enough to power about 586 average U.S. homes.

Its capacity factor of 16% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%16%
Peaking — intermittent or backup
Capacity5 MWnameplate
Annual Generation6.2k MWhEPA eGRID
Capacity Factor16%of theoretical max
Annual CO₂metric tons

Location

Plant NameSweet Tea Solar, Llc
OperatorSweet Tea Solar, Llc
CityNew Bern
CountyCraven County
StateNorth Carolina
ZIP28567
Coordinates35.16089, -77.13330

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

SolarBiomassBattery Storage

Generators (1)

IDTechnologyFuelCapacityStatusOnline
018Solar PhotovoltaicSolar4.5 MWOperating2021

Ownership

OwnerLocationShare
Transalta CorporationCalgary, AB10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionSERC
Balancing AuthorityDuke Energy Progress East

About Solar plants