Electric generating plantEIA plant no. 59455

Tech Park Solar

Type
Solar Photovoltaic
Nameplate capacity
5.0 MW
Units
1
In service since
2012
Operator
RWE Clean Energy
Location
Tucson, Pima County, Arizona
Rated 163rd largest in Arizona · 7466th of 14,761 in the U.S. · by nameplate

Tech Park Solar is a solar power plant in Arizona with a nameplate capacity of 5.0 MW. It generates roughly 13.7k MWh per year — enough to power about 1,305 average U.S. homes.

Its capacity factor of 31% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Tech Park Solar could make 43.8k MWh. In 2023 it made 13.7k MWh — the same as running at full power 31 hours in every 100.

Nameplate, full year43.8k MWh5.0 MW × 8,760 hours
Actually generated13.7k MWhEPA eGRID, 2023 · ≈1,305 homes

Peaking or variableCapacity factor 31%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBattery Storage

Location

Address8410C South Rita Road
CityTucson
CountyPima County
StateArizona
ZIP85747
Coordinates32.09788, -110.81570
OperatorRWE Clean Energy

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
TECHPSolar PhotovoltaicSolar5.0 MWOperating2012

Grid context

NERC RegionWECC
Balancing AuthorityTucson Electric Power Company

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Pima County

View all plants in Pima County →

Data centers near Tech Park Solar

Data centerOperatorDistance
DirecTV data center, 9608 East Old Vail Road, TucsonDirecTV1.7 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more