Time Warner Cable - Knowles

☀ SolarIPP Non-CHP2 MW capacity

745th largest plant in New York · 10231st nationally

Time Warner Cable - Knowles is a solar power plant in New York with a nameplate capacity of 2.0 MW. It generates roughly 3.0k MWh per year — enough to power about 288 average U.S. homes.

Its capacity factor of 17% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%17%
Peaking — intermittent or backup
Capacity2 MWnameplate
Annual Generation3.0k MWhEPA eGRID
Capacity Factor17%of theoretical max
Annual CO₂metric tons

Location

Plant NameTime Warner Cable - Knowles
OperatorTesla Inc.
CityBath
CountySteuben County
StateNew York
ZIP14810
Coordinates42.33743, -77.37532

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricWindSolar

Generators (1)

IDTechnologyFuelCapacityStatusOnline
PV1Solar PhotovoltaicSolar2.0 MWOperating2018

Grid context

NERC RegionNPCC
Balancing AuthorityNew York Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Steuben County

View all plants in Steuben County →