Venture 2 - 1b

☀ SolarIPP Non-CHP1 MW capacity

241st largest plant in Colorado · 11698th nationally

Venture 2 - 1b is a solar power plant in Colorado with a nameplate capacity of 1.5 MW. It generates roughly 3.8k MWh per year — enough to power about 364 average U.S. homes.

Its capacity factor of 29% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%29%
Peaking — intermittent or backup
Capacity2 MWnameplate
Annual Generation3.8k MWhEPA eGRID
Capacity Factor29%of theoretical max
Annual CO₂metric tons

Location

Plant NameVenture 2 - 1b
OperatorUxi Csg Venture 2 8302 Llc
CityAurora
CountyAdams County
StateColorado
ZIP80019
Coordinates39.75224, -104.66509

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBiomass

Generators (1)

IDTechnologyFuelCapacityStatusOnline
75024Solar PhotovoltaicSolar1.5 MWOperating2021

Grid context

NERC RegionWECC
Balancing AuthorityPublic Service Company Of Colorado

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Adams County

View all plants in Adams County →