Electric generating plantEIA plant no. 55795

Woodward Mountain II

Type
Onshore Wind Turbine
Nameplate capacity
78.0 MW
Units
1
In service since
2001
Operator
Pecos Wind II LP
Location
Girvin, Pecos County, Texas
Rated 608th largest in Texas · 3224th of 14,761 in the U.S. · by nameplate

Woodward Mountain II is a wind power plant in Texas with a nameplate capacity of 78.0 MW. It generates roughly 168.8k MWh per year — enough to power about 16,076 average U.S. homes.

Its capacity factor of 25% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Woodward Mountain II could make 683.3k MWh. In 2023 it made 168.8k MWh — the same as running at full power 25 hours in every 100.

Nameplate, full year683.3k MWh78.0 MW × 8,760 hours
Actually generated168.8k MWhEPA eGRID, 2023 · ≈16,076 homes

Peaking or variableCapacity factor 25%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

WindSolarBattery Storage

Location

Address6.5 miles South Hwy
CityGirvin
CountyPecos County
StateTexas
ZIP79740
Coordinates30.95140, -102.41407
OperatorPecos Wind II LP

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
01Onshore Wind TurbineWind78.0 MWOperating2001

Grid context

NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc.

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Pecos County

View all plants in Pecos County →