Juneau County, Wisconsin has 9 power plants totaling 45 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.
| Plant | City | Fuel | Capacity | Operator |
|---|---|---|---|---|
| Petenwell | Necedah | Hydroelectric | 20.0 MW | Wisconsin River Power Company |
| New Lisbon | New Lisbon | Oil | 8.3 MW | City Of New Lisbon |
| Elroy | Elroy | Oil | 6.6 MW | City Of Elroy - (Wi) |
| Lemonweir (Oak 1) | Mauston | Solar | 3.0 MW | Greenbacker Renewable Energy Corporation |
| New Lisbon Solar | New Lisbon | Solar | 2.5 MW | Butter Solar, Llc |
| Whistling Winds Dpc Solar | New Lisbon | Solar | 1.5 MW | Socore Energy Llc |
| Elroy Solar | Mauston | Solar | 1.5 MW | Butter Solar, Llc |
| Webster Creek (Oak 2) | New Lisbon | Solar | 1.5 MW | Greenbacker Renewable Energy Corporation |
| Juneau | Necedah | Oil | — MW | Wisconsin River Power Company |
Juneau County, Wisconsin has 9 power plants totaling 45 MW of nameplate capacity. Hydroelectric is the dominant fuel source at 45% of installed capacity, followed by Oil (33%) and Solar (22%). The largest facility is Petenwell at 20 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.
To find plants closer to a specific address in Juneau County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.