IONIC Digital Cedarvale is a data center in Barstow, Ward County, Texas. It is mapped as 2 buildings covering about 2.6 acres (113,000 sq ft). Its power comes off the Texas (ERCOT) grid, which runs on 50% natural gas, 23% wind and 13% coal.
This data centerOther data centersPower plants (colored by fuel)
| County | Ward County, Texas |
|---|---|
| Coordinates | 31.51379, -103.44904 |
| On OpenStreetMap | relation/21073054, way/1536086683, way/1536086684 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Texas (ERCOT) grid region. In 2023, the region's electricity was 50% natural gas, 23% wind, 13% coal and 9% nuclear.
Each megawatt-hour carried about 733 lb of CO₂, close to the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Texas (ERCOT) grid region (ERCT) in 2023, from eGRID. 477 TWh from 749 plants.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Cedarvale Gas | Natural Gas | 10.0 MW | 0.1 mi |
| Cedarville (TX) | Other Fossil | 9.9 MW | 0.2 mi |
| Elm Street BESS | Battery Storage | 9.9 MW | 6.7 mi |
| Swoose II | Other Fossil | 101 MW | 6.7 mi |
| North Pecos Clean Energy Center (BESS) | Battery Storage | 10.1 MW | 7.2 mi |
| County Road BESS | Battery Storage | 9.9 MW | 8.2 mi |
| Sandlake | Battery Storage | 9.9 MW | 9.9 mi |
| TX8 Worsham | Other Fossil | 9.9 MW | 12.7 mi |
| Rodeo Ranch Energy Storage | Other Fossil | 300 MW | 12.7 mi |
| Saddleback BESS2 | Other Fossil | 9.9 MW | 12.8 mi |
The largest power plant within 50 miles is Permian Basin, a 447 MW natural gas plant 29 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.