IONIC Digital Cedarvale

IONIC Digital Cedarvale is a data center in Barstow, Ward County, Texas. It is mapped as 2 buildings covering about 2.6 acres (113,000 sq ft). Its power comes off the Texas (ERCOT) grid, which runs on 50% natural gas, 23% wind and 13% coal.

OperatorIONIC Digitalas mapped
Roof area2.6 ac2 buildings
Grid CO₂733 lbper MWh, ERCT region
Nearest plant0.1 miCedarvale Gas

Location

This data centerOther data centersPower plants (colored by fuel)

CountyWard County, Texas
Coordinates31.51379, -103.44904
On OpenStreetMaprelation/21073054, way/1536086683, way/1536086684

What powers IONIC Digital Cedarvale

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Texas (ERCOT) grid region. In 2023, the region's electricity was 50% natural gas, 23% wind, 13% coal and 9% nuclear.

Each megawatt-hour carried about 733 lb of CO₂, close to the U.S. grid as a whole (765 lb).

Natural Gas 50%Wind 23%Coal 13%Nuclear 9%Solar 6%

Share of electricity generated in EPA's Texas (ERCOT) grid region (ERCT) in 2023, from eGRID. 477 TWh from 749 plants.

Nearest power plants

PlantFuelCapacityDistance
Cedarvale GasNatural Gas10.0 MW0.1 mi
Cedarville (TX)Other Fossil9.9 MW0.2 mi
Elm Street BESSBattery Storage9.9 MW6.7 mi
Swoose IIOther Fossil101 MW6.7 mi
North Pecos Clean Energy Center (BESS)Battery Storage10.1 MW7.2 mi
County Road BESSBattery Storage9.9 MW8.2 mi
SandlakeBattery Storage9.9 MW9.9 mi
TX8 WorshamOther Fossil9.9 MW12.7 mi
Rodeo Ranch Energy StorageOther Fossil300 MW12.7 mi
Saddleback BESS2Other Fossil9.9 MW12.8 mi

The largest power plant within 50 miles is Permian Basin, a 447 MW natural gas plant 29 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

More

Data centers in Texas · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me