Electric generating plantEIA plant no. 65834

Saddleback BESS2

Type
Other Fossil
Nameplate capacity
9.9 MW
Units
1
In service since
2022
Operator
HEN Infrastructure, L.L.C.
Location
Pecos, Reeves County, Texas
Rated 785th largest in Texas · 6293rd of 14,761 in the U.S. · by nameplate

Saddleback BESS2 is a other fossil power plant in Texas with a nameplate capacity of 9.9 MW.

The 9.9 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A battery storage site

charge middaydischarge evening1battery containers2inverters, both ways3the grid
  1. Rows of shipping-container-sized battery racks store electricity chemically.
  2. Inverters charge them from the grid — often midday, when solar is plentiful and cheap.
  3. In the evening peak the same inverters run the other way and send power back.

Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBattery Storage

Location

Address482 Cr 118
CityPecos
CountyReeves County
StateTexas
ZIP79772
Coordinates31.33288, -103.49842
OperatorHEN Infrastructure, L.L.C.

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
SDLBKBatteriesBattery9.9 MWOperating2022

Ownership

OwnerLocationShare
Manulife Infrastructure II Holdings A, L.P.Boston, MA5307.5%
John Hancock Funding CompanyBoston, MA4324.5%
Hunt Energy Network, LLCDallas, TX368.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc.

About Other Fossil plants

Saddleback BESS2 is a federally registered power generation facility in Texas.

Other plants in Reeves County

View all plants in Reeves County →

Data centers near Saddleback BESS2

Data centerOperatorDistance
IONIC Digital CedarvaleIONIC Digital12.8 mi
Data centerNot recorded22.6 mi
Data centerNot recorded22.8 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more