Electric generating plantEIA plant no. 69422

County Road BESS

Type
Batteries
Nameplate capacity
9.9 MW
Units
1
Operator
County Rd Infra LLC
Location
Pecos, Reeves County, Texas
Rated 785th largest in Texas · 6293rd of 14,761 in the U.S. · by nameplate

County Road BESS is a battery storage power plant in Texas with a nameplate capacity of 9.9 MW.

The 9.9 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A battery storage site

charge middaydischarge evening1battery containers2inverters, both ways3the grid
  1. Rows of shipping-container-sized battery racks store electricity chemically.
  2. Inverters charge them from the grid — often midday, when solar is plentiful and cheap.
  3. In the evening peak the same inverters run the other way and send power back.

Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBattery Storage

Location

Address300 Cr 301
CityPecos
CountyReeves County
StateTexas
ZIP79772
Coordinates31.40078, -103.49439
OperatorCounty Rd Infra LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
CTRDBatteriesBattery9.9 MWUnder Construction—

Grid context

NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc.

About Battery Storage plants

Battery storage facilities don't generate electricity — they store it. They charge from the grid (often from solar during the day) and discharge during peak demand or to firm up renewables. EIA classifies them as power plants because they connect to the grid like one.

Other plants in Reeves County

View all plants in Reeves County →

Data centers near County Road BESS

Data centerOperatorDistance
IONIC Digital CedarvaleIONIC Digital8.2 mi
Data centerNot recorded20.2 mi
Data centerNot recorded20.5 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more