3 data centers are mapped in Orange County, California: 3 buildings covering about 3.1 acres (134,000 sq ft) of roof. Operators include Lumen Technologies, TPx Communications. The county is in EPA's California grid region, whose electricity is 43% natural gas, 20% solar and 14% hydroelectric, at 426 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| Lumen Technologies data center, Tustin | Tustin | 2.0 ac |
| TPx Colocation Datacenter | Santa Ana | 0.8 ac |
| Xo Communications Colocation Data Center | Santa Ana | 0.3 ac |
Data centers in Orange County draw from the regional grid. In 2023, electricity in EPA's California region was 43% natural gas, 20% solar, 14% hydroelectric and 8% nuclear, at 426 lb of CO₂ per megawatt-hour, 44% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's California grid region (CAMX) in 2023, from eGRID. 222 TWh from 1,674 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Southern California Edison Co | 23.1¢ | 20.6¢ |
| San Diego Gas & Electric Co | 35.5¢ | 26.2¢ |
| City of Anaheim - (CA) | 17.7¢ | 15.5¢ |
Utilities that report serving Orange County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| AES Huntington Beach Energy Project | Natural Gas | 699 MW |
| AES Huntington Beach LLC | Natural Gas | 218 MW |
| Canyon Power Plant | Natural Gas | 200 MW |
| Stanton Energy Reliability Center Hybrid | Natural Gas | 161 MW |
| Johanna Energy Center, LLC | Other Fossil | 80.0 MW |
| Stanton Battery Energy Storage | Other Fossil | 68.8 MW |
| Barre Peaker | Natural Gas | 49.8 MW |
| Brea Expansion Plant | Biomass | 35.7 MW |
| BCE Seal Beach | Battery Storage | 28.7 MW |
| Bowerman Power LFG, LLC | Biomass | 23.8 MW |
| Hecate Energy Johanna Facility | Other Fossil | 20.0 MW |
| BCE Los Alamitos 2 | Solar | 20.0 MW |
| BCE Los Alamitos 1 | Solar | 20.0 MW |
| UCI Facilities Management Central Plant | Natural Gas | 19.0 MW |
| Plant No 2 Orange County | Biomass | 16.0 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.