3 data centers are mapped in Fairfield County, Connecticut: 3 buildings covering about 5.1 acres (222,000 sq ft) of roof. Operators include CyrusOne, Digital Realty. The county is in EPA's New England grid region, whose electricity is 56% natural gas, 23% nuclear and 8% hydroelectric, at 537 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| Digital Realty New York HVN10 | Trumbull | 3.1 ac |
| NYM5 | Norwalk | 1.8 ac |
| amnet Data Center | Stamford | 0.2 ac |
Data centers in Fairfield County draw from the regional grid. In 2023, electricity in EPA's New England region was 56% natural gas, 23% nuclear, 8% hydroelectric and 4% biomass, at 537 lb of CO₂ per megawatt-hour, 30% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's New England grid region (NEWE) in 2023, from eGRID. 103 TWh from 1,274 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Connecticut Light & Power Co | 22.7¢ | 21.4¢ |
| United Illuminating Co | 24.3¢ | 17.6¢ |
Utilities that report serving Fairfield County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Bridgeport Station | Natural Gas | 576 MW |
| Bridgeport Energy Project | Natural Gas | 520 MW |
| Cos Cob | Oil | 115 MW |
| Waterside Power, LLC | Oil | 69.6 MW |
| Wheelabrator Bridgeport | Biomass | 67.0 MW |
| Stevenson | Hydroelectric | 30.5 MW |
| Bridgeport Fuel Cell, LLC | Natural Gas | 16.6 MW |
| Stamford Health | Oil | 10.4 MW |
| Sikorsky Aircraft CHP | Natural Gas | 9.9 MW |
| Derby Hydro | Hydroelectric | 8.6 MW |
| UI RCP Bridgeport Seaside | Natural Gas | 5.0 MW |
| Fairfield University CHP Plant | Natural Gas | 4.5 MW |
| Danbury Hospital Cogen Plant | Natural Gas | 4.3 MW |
| TRS Fuel Cell | Natural Gas | 3.7 MW |
| Emerald Gardens PKI, LLC | Solar | 1.6 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.