2 data centers are mapped in Richmond County, New York: 2 buildings covering about 3.0 acres (133,000 sq ft) of roof. Operators include Merrill Lynch, Telehouse. The county is in EPA's New York City grid region, whose electricity is 98% natural gas, at 864 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| Telehouse Teleport | New York City | 1.6 ac |
| Merrill Lynch Data Center | Staten Island | 1.4 ac |
Data centers in Richmond County draw from the regional grid. In 2023, electricity in EPA's New York City region was 98% natural gas, at 864 lb of CO₂ per megawatt-hour, 13% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's New York City grid region (NYCW) in 2023, from eGRID. 34.6 TWh from 108 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Consolidated Edison Co-NY Inc | 28.2¢ | 30.9¢ |
Utilities that report serving Richmond County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Arthur Kill Generating Station | Natural Gas | 878 MW |
| Pouch | Natural Gas | 47.0 MW |
| Empire Clean Energy, LLC | Battery Storage | 10.0 MW |
| Gabby Giffords Clean Energy, LLC | Battery Storage | 8.0 MW |
| Nelson Clean Energy, LLC | Battery Storage | 8.0 MW |
| Fox Hills Battery Station | Other Fossil | 7.5 MW |
| Certain Solar - Staten Island | Natural Gas | 7.5 MW |
| Apple Staten Island - Industrial Loop | Natural Gas | 5.0 MW |
| Apple Staten Island - Winant Place | Natural Gas | 5.0 MW |
| Arthur Kill Energy, LLC | Battery Storage | 5.0 MW |
| Amazon JFK8 Solar Project | Solar | 4.9 MW |
| Fuel Cell 18B Sneden Avenue | Natural Gas | 4.2 MW |
| Fuel Cell 18A Sneden Avenue | Natural Gas | 3.6 MW |
| Mourning Dove Clean Energy, LLC | Battery Storage | 3.0 MW |
| Richmond University Medical Center | Oil | 2.8 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.