Merrill Lynch Data Center is a data center in Staten Island, Richmond County, New York. It is mapped as 1 building covering about 1.4 acres (63,000 sq ft). Its power comes off the New York City grid (New York ISO), which runs on 98% natural gas.
This data centerOther data centersPower plants (colored by fuel)
| Address | 10 Teleport Drive, Staten Island NY 10314 |
|---|---|
| County | Richmond County, New York |
| Coordinates | 40.60748, -74.17293 |
| On OpenStreetMap | way/247427998 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's New York City grid region, and the county's largest utility is on the New York ISO grid. In 2023, the region's electricity was 98% natural gas.
Each megawatt-hour carried about 864 lb of CO₂, 13% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's New York City grid region (NYCW) in 2023, from eGRID. 34.6 TWh from 108 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Consolidated Edison Co-NY Inc | 28.2¢ | 30.9¢ |
Utilities that report serving Richmond County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Amazon JFK8 Solar Project | Solar | 4.9 MW | 1.1 mi |
| Arthur Kill Generating Station | Natural Gas | 878 MW | 1.8 mi |
| Linden Generating Station | Natural Gas | 1,740 MW | 2.0 mi |
| Linden Solar Farm | Solar | 2.7 MW | 2.3 mi |
| Sugar Maple Clean Energy LLC | Battery Storage | 2.5 MW | 2.8 mi |
| Mourning Dove Clean Energy, LLC | Battery Storage | 3.0 MW | 2.8 mi |
| Linden Cogen Plant | Natural Gas | 974 MW | 2.8 mi |
| Ios - Erw9 | Solar | 5.3 MW | 2.9 mi |
| Port Richmond WWT Solar | Solar | 1.0 MW | 3.2 mi |
| Bayway Refinery | Other Fossil | 11.2 MW | 3.3 mi |
The largest power plant within 50 miles is Ravenswood, a 2,096 MW natural gas plant 16 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| Telehouse Teleport | 1.6 ac | 0.1 mi |
| Data center, 1400 Federal Boulevard, Carteret | 3.6 ac | 4.0 mi |
Data centers in New York · Data centers in Richmond County · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.