Power Plants Near 28742 — Horse Shoe, NC
74 power plants within 50 miles of ZIP 28742 (Horse Shoe, North Carolina). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 35.3432, -82.5565 · County: Henderson
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 9.0 mi | Asheville Arden, NC | Natural Gas | 1,012 MW | Duke Energy Progress - (Nc) |
| 10.5 mi | Sawtell Solar Hendersonville, NC | Solar | 3 MW | Sawtell Solar, Llc |
| 11.4 mi | Innovative Solar 14, Llc Hendersonville, NC | Solar | 2 MW | Aes Distributed Energy |
| 11.6 mi | Tuxedo Flat Rock, NC | Hydroelectric | 5 MW | Northbrook Tuxedo, Llc |
| 11.7 mi | Innovative Solar 16 Hendersonville, NC | Solar | 2 MW | Cypress Creek Renewables |
| 13.8 mi | Asheville-Rock Hill Battery Asheville, NC | Other Fossil | 9 MW | Duke Energy Progress - (Nc) |
| 14.2 mi | Enka Enka, NC | Coal | — | Basf Corporation |
| 15.2 mi | Biltmore Solar Fields Asheville, NC | Solar | 2 MW | The Biltmore Company |
| 20.8 mi | Riverside Bess Asheville, NC | Battery Storage | — | Duke Energy Progress - (Nc) |
| 20.8 mi | Innovative Solar 10 Canton, NC | Solar | 2 MW | Cypress Creek Renewables |
| 20.9 mi | Turner Shoals Mill Springs, NC | Hydroelectric | 5 MW | Northbrook Carolina Hydro Llc |
| 21.2 mi | Woodfin Woodfin, NC | Natural Gas | — | Duke Energy Progress - (Nc) |
| 21.3 mi | Metropolitan Sewerage District Asheville, NC | Hydroelectric | 2 MW | Metropolitan Sewerage District |
| 21.7 mi | Lake Lure Lake Lure, NC | Hydroelectric | 4 MW | Lake Lure Town Of |
| 22.0 mi | Woodfin Solar Asheville, NC | Solar | 5 MW | Duke Energy Progress - (Nc) |
| 23.4 mi | Innovative Solar 6 Leicester, NC | Solar | 4 MW | Cypress Creek Renewables |
| 26.3 mi | Marshall Dam Marshall, NC | Hydroelectric | 5 MW | Duke Energy Progress - (Nc) |
| 26.7 mi | Tennessee Creek Tuckasegee, NC | Hydroelectric | 11 MW | Duke Energy Carolinas, Llc |
| 29.8 mi | Ivy River Hydro Marshall, NC | Hydroelectric | 1 MW | Madison Hydro Partners |
| 29.9 mi | Bear Creek Dam Tuckasegee, NC | Hydroelectric | 9 MW | Duke Energy Carolinas, Llc |
| 31.2 mi | Cedar Cliff Tuckasegee, NC | Hydroelectric | 6 MW | Duke Energy Carolinas, Llc |
| 32.5 mi | Ballenger Road Solar A Inman, SC | Solar | 2 MW | Ballenger Road Solar A |
| 32.9 mi | Tuckasegee Tuckasegee, NC | Hydroelectric | 3 MW | Duke Energy Carolinas, Llc |
| 33.0 mi | Thorpe Tuckasegee, NC | Hydroelectric | 22 MW | Duke Energy Carolinas, Llc |
| 33.4 mi | Jocassee Salem, SC | Hydroelectric | 774 MW | Duke Energy Carolinas, Llc |
| 33.7 mi | Wellford Renewable Energy Plant Spartanburg, SC | Biomass | 2 MW | Lockhart Power Co |
| 34.0 mi | Bad Creek Salem, SC | Hydroelectric | 1,584 MW | Duke Energy Carolinas, Llc |
| 34.2 mi | Saluda Dam Greenville, SC | Hydroelectric | 2 MW | Northbrook Carolina Hydro Llc |
| 34.3 mi | Central Plant Greenville, SC | Oil | 4 MW | Bob Jones University |
| 35.6 mi | Amethyst Solar Forest City, NC | Solar | 3 MW | Amethyst Solar Llc |
| 36.7 mi | Westminister Nc Rutherfordton, NC | Solar | — | Ecoplexus, Inc |
| 36.9 mi | Walters Waterville, NC | Hydroelectric | 108 MW | Duke Energy Progress - (Nc) |
| 36.9 mi | Spartanburg Water System Chesnee, SC | Hydroelectric | 3 MW | Spartanburg Commissioners Pw |
| 37.3 mi | Cornell Dubilier Liberty, SC | Oil | — | South Carolina Public Service Authority |
| 37.7 mi | Atood Solar Iii Llc Spartanburg, SC | Solar | 2 MW | Atood Solar Iii Llc |
| 37.7 mi | Aga Tag Solar Iii Llc Spartanburg, SC | Solar | 2 MW | Aga Tag Solar Iii Llc |
| 37.7 mi | Bmw Manufacturing Co Greer, SC | Biomass | 11 MW | Bmw Manufacturing Co Llc |
| 39.5 mi | White Horse Solar A Greenville, SC | Solar | 2 MW | White Horse Solar A |
| 40.4 mi | Clear Solar I, Llc Forest City, NC | Solar | 4 MW | Clear Solar I, Llc |
| 40.7 mi | Highway 9 Solar Spartanburg, SC | Solar | — | Jsd Flatwood Pv-1, Llc |
| 40.7 mi | Bostic Delivery No 2 Bostic, NC | Oil | 1 MW | North Carolina Mun Power Agny #1 |
| 40.7 mi | Hot Springs Energy Storage & Microgrid Hot Springs, NC | Solar | 6 MW | Duke Energy Progress - (Nc) |
| 41.4 mi | Rutherford Farm Forest City, NC | Solar | 75 MW | Southern Power Co |
| 41.5 mi | Davis Road Solar Spartanburg, SC | Solar | — | Jsd Flatwood Pv-1, Llc |
| 41.6 mi | Fairview Solar Spartanburg, SC | Solar | — | Jsd Flatwood Pv-1, Llc |
| 41.7 mi | Gamble Solar Bostic, NC | Solar | 3 MW | Oppidum Renewables Usa, Llc |
| 41.7 mi | Lincoln Solar, Llc (Nc) Bostic, NC | Solar | 5 MW | Cypress Creek Renewables |
| 41.8 mi | Charlotte Solar Forest City, NC | Solar | 5 MW | Cypress Creek Renewables |
| 42.1 mi | Keowee Seneca, SC | Hydroelectric | 158 MW | Duke Energy Carolinas, Llc |
| 42.1 mi | Old Caroleen Solar Farm Forest City, NC | Solar | 2 MW | Cypress Creek Renewables |
| 42.1 mi | Limelight Solar Iii, Llc Spartanburg, SC | Solar | 4 MW | Limelight Solar Iii, Llc |
| 42.1 mi | Limelight Solar I, Llc Spartanburg, SC | Solar | 2 MW | Limelight Solar I, Llc |
| 42.2 mi | Bryant Road Solar Spartanburg, SC | Solar | 2 MW | Jsd Flatwood Pv-1, Llc |
| 42.6 mi | Oconee Seneca, SC | Nuclear | 2,667 MW | Duke Energy Carolinas, Llc |
| 42.9 mi | Ace Solar Piedmont, SC | Solar | 1 MW | Altus Power America Management, Llc |
| 43.0 mi | Enoree Phase Ii Landfill Gas Recovery Greer, SC | Biomass | 3 MW | Enerdyne Power Systems Inc |
| 43.0 mi | Innovative Solar 18, Llc Bostic, NC | Solar | 2 MW | Cypress Creek Renewables |
| 43.0 mi | Whitt Solar Piedmont, SC | Solar | 2 MW | Altus Power America Management, Llc |
| 44.6 mi | Piedmont Hydro Power Project Piedmont, SC | Hydroelectric | 1 MW | Central Rivers Power Us, Llc |
| 44.7 mi | Innovative Solar 15, Llc Ellenboro, NC | Solar | 2 MW | Aes Distributed Energy |
| 44.7 mi | Ruff Solar Llc Ellenboro, NC | Solar | 22 MW | Sol Systems |
| 44.8 mi | Adams Piedmont, SC | Solar | 2 MW | Adams Solar Sc, Llc |
| 45.3 mi | Limelight Solar Ii Llc Spartanburg, SC | Solar | 2 MW | Limelight Solar Ii Llc |
| 45.8 mi | James E. Rogers Energy Complex Cliffside, NC | Natural Gas | 1,531 MW | Duke Energy Carolinas, Llc |
| 46.7 mi | Broad River Solar, Llc Mooresboro, NC | Solar | 50 MW | Duke Energy Renewables Services |
| 46.7 mi | Franklin (Nc) Franklin, NC | Hydroelectric | 1 MW | Northbrook Carolina Hydro Ii, Llc |
| 47.3 mi | Clifton Dam 3 Power Station Converse, SC | Hydroelectric | 1 MW | Converse Energy Inc |
| 47.5 mi | Atood Ii Cowpens, SC | Solar | 2 MW | Cypress Creek Renewables |
| 47.5 mi | Pelzer Solar I Pelzer, SC | Solar | 1 MW | Altus Power America Management, Llc |
| 48.4 mi | Duke Energy Chp At Clemson University Clemson, SC | Natural Gas | 13 MW | Duke Energy Carolinas, Llc |
| 48.5 mi | Sophie Solar Mooresboro, NC | Solar | 5 MW | Sophie Solar Llc |
| 48.6 mi | Central Energy Facility Clemson, SC | Natural Gas | 6 MW | Clemson University - Main Campus |
| 48.8 mi | Pelzer Upper Petzer, SC | Hydroelectric | 2 MW | Central Rivers Power Us, Llc |
| 49.0 mi | Bridgewater Morganton, NC | Hydroelectric | 28 MW | Duke Energy Carolinas, Llc |
Power generation near this area
There are 74 power plants within 50 miles of Horse Shoe, North Carolina (ZIP 28742), with a combined 8,220 MW of nameplate capacity. Solar is the most common fuel type in this area with 37 of the 74 nearby plants. The closest plant is Asheville at 9.0 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in North Carolina, visit the North Carolina state page.
← Search a different location · Printable proximity report →