Power Plants Near 31627 — Cecil, GA
31 power plants within 50 miles of ZIP 31627 (Cecil, Georgia). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 31.0403, -83.3915 · County: Cook
| Distance | Plant | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| 11.1 mi | Valdosta Prison Valdosta, GA | Solar | 1 MW | Madison Energy Holdings LLC |
| 11.5 mi | Moody Air Force Base Solar Valdosta, GA | Solar | 99 MW | Georgia Power Co |
| 12.0 mi | Valdosta Water Treatment Plant Valdosta, GA | Oil | 3 MW | City of Valdosta - (GA) |
| 12.3 mi | SR Odom Moultrie, GA | Solar | 20 MW | Odom Solar, LLC |
| 13.7 mi | South Georgia Medical Center Inc Valdosta, GA | Oil | 6 MW | Lowndes County Hospital Authority |
| 15.7 mi | Pecan Row Landfill To Electric Facility Valdosta, GA | Biomass | 6 MW | Energy Developments, Inc d/b/a EDL |
| 17.2 mi | Lowndes IDA Valdosta, GA | Solar | 2 MW | Safari Energy, LLC |
| 17.6 mi | Lowndes Cowart Valdosta, GA | Solar | 3 MW | Madison Energy Investments LLC |
| 18.7 mi | Valdosta (Terraform) Valdosta, GA | Solar | 1 MW | Terraform Arcadia |
| 19.7 mi | Quitman II Solar Quitman, GA | Solar | 150 MW | Quitman II Solar, LLC |
| 19.9 mi | Quitman Solar Quitman, GA | Solar | 150 MW | Quitman Solar, LLC |
| 19.9 mi | Lakeland Solar Energy LLC Lakeland, GA | Solar | 2 MW | Invenergy Services LLC |
| 24.5 mi | PCA-Valdosta Mill Valdosta, GA | Biomass | 70 MW | PCA-Valdosta Mill |
| 27.7 mi | Lowndes Tycor Farms Lake Park, GA | Solar | 2 MW | Safari Energy, LLC |
| 30.1 mi | Denver Braswell PV Moultrie, GA | Solar | 1 MW | Madison Energy Holdings LLC |
| 30.5 mi | Tift Bowen Tifton, GA | Solar | 2 MW | Madison Energy Investments LLC |
| 31.9 mi | Tift Fletcher Tifton, GA | Solar | 3 MW | Madison Energy Investments LLC |
| 32.9 mi | Tift Boyd Tifton, GA | Solar | 3 MW | Westbound Solar 3, LLC |
| 34.8 mi | Jennings Energy Storage Facility Jennings, FL | Other Fossil | 6 MW | Duke Energy Florida, LLC |
| 40.1 mi | Oil Dri 2 Solar Ochlocknee, GA | Solar | 1 MW | Westbound Solar LLC |
| 42.9 mi | Hamilton Solar Power Plant Jasper, FL | Solar | 75 MW | Duke Energy Florida, LLC |
| 44.9 mi | Camilla Solar Plant Pelham, GA | Solar | 16 MW | Axium US Solar Holdings LLC |
| 45.0 mi | Norton Creek Tbd, FL | Solar | 75 MW | Florida Power & Light Co |
| 46.0 mi | Oe_ga3 Camilla, GA | Solar | 58 MW | Onward Energy |
| 46.9 mi | Twin Rivers Solar Power Plant Jasper, FL | Solar | 75 MW | Duke Energy Florida, LLC |
| 47.2 mi | Sowega Power Baconton, GA | Natural Gas | 100 MW | SOWEGA Power LLC |
| 47.2 mi | Baconton Power Plant Baconton, GA | Natural Gas | 121 MW | Baconton Power LLC |
| 47.5 mi | Suwannee Live Oak, FL | Battery Storage | 5 MW | Duke Energy Florida, LLC |
| 47.6 mi | Suwannee River Live Oak, FL | Natural Gas | 198 MW | Duke Energy Florida, LLC |
| 47.7 mi | Suwannee Solar Facility Live Oak, FL | Solar | 9 MW | Duke Energy Florida, LLC |
| 49.0 mi | Hickory Park Solar Hybrid Camilla, GA | Solar | 236 MW | RWE Clean Energy |
Power generation near this area
There are 31 power plants within 50 miles of Cecil, Georgia (ZIP 31627), with a combined 1,496 MW of nameplate capacity. Solar is the most common fuel type in this area with 22 of the 31 nearby plants. The closest plant is Valdosta Prison at 11.1 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Georgia, visit the Georgia state page.
← Search a different location · Printable proximity report →