Power Plants Near 34428 — Crystal River, FL

21 power plants within 50 miles of ZIP 34428 (Crystal River, Florida). Click any plant for capacity, generation, emissions, and generator-level detail.

Centroid: 28.9584, -82.5993 · County: Citrus

Natural Gas 84%Solar 15%
DistancePlantFuelNameplate capacityOperator
5.3 miBay Trail Solar Power Plant
Crystal River, FL
Solar75 MWDuke Energy Florida, LLC
6.0 miCrystal River
Crystal River, FL
Natural Gas3,449 MWDuke Energy Florida, LLC
25.6 miJumper Creek Solar Plant
Lake Panasoffkee, FL
Solar75 MWDuke Energy Florida, LLC
26.6 miHalf Moon Solar Plant
Lake Panasoffkee, FL
Solar75 MWDuke Energy Florida, LLC
29.2 miRattler Solar Plant
Brookesville, FL
Solar75 MWDuke Energy Florida, LLC
34.8 miG2 Energy Marion LLC
Ocala, FL
Biomass1 MWG2 Energy LLC
35.0 miBronson Solar
Bronson, FL
Solar75 MWBronson Solar LLC
36.9 miWhistling Duck I
Williston, FL
Solar75 MWOrigis Energy USA, Inc
39.3 miHardeetown Solar Power Plant
Chiefland, FL
Solar75 MWDuke Energy Florida, LLC
40.9 miPasco Cnty Solid Waste Resource Recovery
Spring Hill, FL
Biomass31 MWPasco County - (FL)
41.0 miShady Hills Generating Station
Shady Hills, FL
Natural Gas541 MWShady Hills Power Co LLC
42.9 miMicanopy Energy Storage Facility
Micanopy, FL
Other Fossil8 MWDuke Energy Florida, LLC
45.0 miMountain View Solar (FL)
Dade City, FL
Solar55 MWTampa Electric Co
45.5 miCovanta Lake County Energy
Okahumpka, FL
Biomass16 MWCovanta Lake Inc
45.5 miCutrale Citrus Juices USA I
Leesburg, FL
Natural Gas4 MWCutrale Citrus Juices USA Inc
45.8 miGilchrist County Solar
Newberry, FL
Solar75 MWFRP Gilchrist County Solar, LLC
47.0 miTrenton
Trenton, FL
Other Fossil11 MWDuke Energy Florida, LLC
47.8 miButler Plaza
Gainesville, FL
Solar1 MWClean Focus Yield, LLC
49.0 miTrenton Solar Power Plant
Trenton, FL
Solar75 MWDuke Energy Florida, LLC
49.5 miUniversity of Florida
Gainesville, FL
Natural Gas54 MWDuke Energy Florida, LLC
49.5 miSouth Energy Center
Gainesville, FL
Natural Gas12 MWGainesville Regional Utilities

Power generation near this area

There are 21 power plants within 50 miles of Crystal River, Florida (ZIP 34428), with a combined 4,856 MW of nameplate capacity. Solar is the most common fuel type in this area with 11 of the 21 nearby plants. The closest plant is Bay Trail Solar Power Plant at 5.3 miles.

Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.

All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Florida, visit the Florida state page.

← Search a different location · Printable proximity report →