Power Plants Near 34789 — Leesburg, FL
27 power plants within 50 miles of ZIP 34789 (Leesburg, Florida). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 28.8108, -81.8779 · County: Lake
| Distance | Plant | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| 0.8 mi | Cutrale Citrus Juices USA I Leesburg, FL | Natural Gas | 4 MW | Cutrale Citrus Juices USA Inc |
| 4.9 mi | Covanta Lake County Energy Okahumpka, FL | Biomass | 16 MW | Covanta Lake Inc |
| 11.8 mi | Mount Dora Solar Farm F Mount Dora, FL | Solar | 2 MW | Green Street Power Partners |
| 15.5 mi | Mount Dora Solar Farm W Mount Dora, FL | Solar | 2 MW | Green Street Power Partners |
| 19.8 mi | Half Moon Solar Plant Lake Panasoffkee, FL | Solar | 75 MW | Duke Energy Florida, LLC |
| 20.6 mi | Jumper Creek Solar Plant Lake Panasoffkee, FL | Solar | 75 MW | Duke Energy Florida, LLC |
| 24.1 mi | G2 Energy Marion LLC Ocala, FL | Biomass | 1 MW | G2 Energy LLC |
| 27.7 mi | Rattler Solar Plant Brookesville, FL | Solar | 75 MW | Duke Energy Florida, LLC |
| 31.9 mi | Altamonte Mall Altamonte Springs, FL | Solar | 2 MW | Altamonte Mall |
| 32.5 mi | Citrus Ridge Solar Bay Lake, FL | Solar | 52 MW | FL Solar 5, LLC |
| 33.5 mi | Sanford DeBary, FL | Natural Gas | 2,378 MW | Florida Power & Light Co |
| 33.6 mi | DeBary DeBary, FL | Natural Gas | 748 MW | Duke Energy Florida, LLC |
| 33.7 mi | Debary Solar Power Plant DeBary, FL | Solar | 75 MW | Duke Energy Florida, LLC |
| 35.3 mi | Mountain View Solar (FL) Dade City, FL | Solar | 55 MW | Tampa Electric Co |
| 35.7 mi | Walt Disney World Solar Facility Orlando, FL | Solar | 5 MW | Duke Energy Florida Solar Solutions |
| 38.0 mi | Orlando Cogen LP Orlando, FL | Natural Gas | 122 MW | Florida Municipal Power Agency (FL) |
| 42.4 mi | Cane Island Intercession City, FL | Natural Gas | 706 MW | Kissimmee Utility Authority |
| 42.8 mi | Intercession City Intercession City, FL | Natural Gas | 1,197 MW | Duke Energy Florida, LLC |
| 44.3 mi | Lockheed Martin Solar Orlando, FL | Solar | 5 MW | Lockheed Martin RMS |
| 46.6 mi | Juniper Solar (FL) Zephyrhills, FL | Solar | 70 MW | Tampa Electric Co |
| 47.7 mi | RP-Orlando, LLC Orlando, FL | Solar | 5 MW | Deriva Energy |
| 47.8 mi | Seminole Energy Geneva, FL | Biomass | 5 MW | NextEra Renewable Fuels, LLC |
| 48.2 mi | ACE-Stanton PV Orlando, FL | Solar | 5 MW | ACE-Stanton, LLC |
| 48.3 mi | ACE-Stanton A PV Orlando, FL | Solar | 4 MW | ACE-Stanton A, LLC |
| 48.5 mi | Curtis H Stanton Energy Center Orlando, FL | Natural Gas | 688 MW | Stanton Clean Energy LLC |
| 48.7 mi | Stanton Energy Center Orlando, FL | Coal | 1,262 MW | Orlando Utilities Comm |
| 49.8 mi | Bay Trail Solar Power Plant Crystal River, FL | Solar | 75 MW | Duke Energy Florida, LLC |
Power generation near this area
There are 27 power plants within 50 miles of Leesburg, Florida (ZIP 34789), with a combined 7,707 MW of nameplate capacity. Solar is the most common fuel type in this area with 16 of the 27 nearby plants. The closest plant is Cutrale Citrus Juices USA I at 0.8 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Florida, visit the Florida state page.
← Search a different location · Printable proximity report →