Power Plants Near 79058 — Masterson, TX
26 power plants within 50 miles of ZIP 79058 (Masterson, Texas). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 35.6359, -101.9602 · County: Moore
| Distance | Plant | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| 12.1 mi | T-Bone Wind (10) LLC Dumas, TX | Wind | 9 MW | UPC Power Solutions |
| 12.2 mi | Ribeye Wind (11) LLC Dumas, TX | Wind | 10 MW | UPC Power Solutions |
| 21.6 mi | Sunray Wind I Sunray, TX | Wind | 50 MW | Diamond Shamrock Refining Company LP |
| 24.1 mi | Tri-Tip Wind (9) LLC Sunray, TX | Wind | 10 MW | UPC Power Solutions |
| 26.2 mi | Harrington Amarillo, TX | Coal | 1,080 MW | Southwestern Public Service Co |
| 26.3 mi | Brisket Wind (8) LLC Sunray, TX | Wind | 10 MW | UPC Power Solutions |
| 27.2 mi | Nichols Amarillo, TX | Natural Gas | 475 MW | Southwestern Public Service Co |
| 27.2 mi | Flat Iron Wind (7) LLC Sunray, TX | Wind | 10 MW | UPC Power Solutions |
| 27.5 mi | Majestic II Wind Panhandle, TX | Wind | 80 MW | NextEra Energy Majestic Wind |
| 29.5 mi | Majestic 1 Wind Farm Panhandle, TX | Wind | 80 MW | NextEra Energy Majestic Wind |
| 29.5 mi | Borger Plant Borger, TX | Other Fossil | 30 MW | Sid Richardson Carbon Ltd |
| 29.7 mi | Engineered Carbons Borger Cogen Borger, TX | Other Fossil | 20 MW | Orion Engineered Carbons |
| 30.5 mi | Golden Spread Panhandle Wnd Rch Wilderado, TX | Wind | 78 MW | Golden Spread Electric Cooperative, Inc |
| 30.6 mi | Wildorado Wind LLC Vega, TX | Wind | 161 MW | Wildorado Wind, LLC |
| 30.7 mi | Spinning Spur Wind LLC Vegas, TX | Wind | 161 MW | EDF Renewable Asset Holdings, Inc. |
| 32.4 mi | Pantex Amarillo, TX | Wind | 12 MW | Pantex (NNSA) |
| 33.9 mi | Black Hawk Station Borger, TX | Natural Gas | 244 MW | Borger Energy Associates LP |
| 35.6 mi | Pattern Panhandle Wind 2 LLC Panhandle, TX | Wind | 182 MW | Pattern Operators LP |
| 36.1 mi | Canadian Breaks, LLC Vega, TX | Wind | 210 MW | Canadian Breaks LLC |
| 41.4 mi | Llano Estacado Wind Ranch White Deer, TX | Wind | 80 MW | Llano Estacado Wind Ranch |
| 42.0 mi | Route 66 Wind Plant Panhandle, TX | Wind | 150 MW | Onward Energy |
| 42.3 mi | Pattern Panhandle Wind LLC Panhandle, TX | Wind | 218 MW | Pattern Operators LP |
| 45.7 mi | Grandview Wind Farm, LLC Panhandle, TX | Wind | 211 MW | RWE Clean Energy |
| 47.3 mi | UL Advanced Wind Turbine Test Facility Canyon, TX | Wind | 4 MW | West Texas A&M University |
| 47.6 mi | Spinning Spur Wind II Adrian, TX | Wind | 161 MW | EDF Renewable Asset Holdings, Inc. |
| 48.9 mi | Spinning Spur Wind III Adrian, TX | Wind | 194 MW | Boralex US Operations LLC |
Power generation near this area
There are 26 power plants within 50 miles of Masterson, Texas (ZIP 79058), with a combined 3,927 MW of nameplate capacity. Wind is the most common fuel type in this area with 21 of the 26 nearby plants. The closest plant is T-Bone Wind (10) LLC at 12.1 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Texas, visit the Texas state page.
← Search a different location · Printable proximity report →