Power Plants Near 84644 — Meadow, UT
27 power plants within 50 miles of ZIP 84644 (Meadow, Utah). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 38.8858, -112.4105 · County: Millard
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 5.8 mi | Pavant Solar, Llc Fillmore, UT | Solar | 50 MW | Onward Energy |
| 18.8 mi | Pavant Solar Iii Filmore, UT | Solar | 20 MW | Invenergy Services Llc |
| 19.5 mi | Pavant Solar Ii Llc Fillmore, UT | Solar | 50 MW | Pavant Solar Ii Llc |
| 21.9 mi | Sigurd Solar Llc Sigurd, UT | Solar | 80 MW | Sigurd Solar Llc |
| 24.3 mi | Cove Fort Cove Fort, UT | Geothermal | 25 MW | Ormat Cove Fort Llc |
| 34.9 mi | Milford Wind Corridor Stage Ii Llc Milford, UT | Wind | 102 MW | Milford Wind Corridor Stage Ii Llc |
| 36.4 mi | Blundell Milford, UT | Geothermal | 38 MW | Pacificorp |
| 36.6 mi | Intermountain Pumped Storage Project Delta, UT | Hydroelectric | — | Premium Energy Holdings |
| 37.2 mi | Milford Wind Corridor I Llc Milford, UT | Wind | 204 MW | Milford Wind Corridor Phase I, Llc (Longroad) |
| 37.5 mi | Rodatherm Milford 1 Milford, UT | Geothermal | — | Rodatherm Energy Corporation |
| 38.1 mi | Gunnison Solar Gunnison, UT | Solar | 2 MW | Greenbacker Renewable Energy Corporation |
| 38.1 mi | Cape Generating Station Milford, UT | Geothermal | — | Cape Holdco Llc |
| 41.1 mi | Escalante Solar Iii, Llc Milford, UT | Solar | 80 MW | Clearway Renewable Operation & Maintenance Llc |
| 41.9 mi | Escalante Solar I, Llc Milford, UT | Solar | 80 MW | Clearway Renewable Operation & Maintenance Llc |
| 42.7 mi | Milford Solar 1 Milford, UT | Solar | 99 MW | Milford Solar 1, Llc |
| 42.7 mi | Escalante Solar Ii, Llc Milford, UT | Solar | 80 MW | Clearway Renewable Operation & Maintenance Llc |
| 42.8 mi | Upper Beaver Beaver, UT | Hydroelectric | 3 MW | Beaver City Corporation |
| 43.1 mi | Utah Solar 1 Delta, UT | Solar | — | Ecg Utah Solar1, Llc |
| 44.1 mi | Intermountain Power Project Delta, UT | Coal | 1,640 MW | Los Angeles Department Of Water & Power |
| 44.6 mi | Gale 1 Solar Delta, UT | Solar | — | 33ui 8me Llc |
| 45.7 mi | Granite Peak Solar Plant Milford, UT | Solar | 3 MW | Evergreen Wind, Llc |
| 45.8 mi | Notch Peak Solar Llc Lynndyl, UT | Solar | — | Notch Peak Solar Llc |
| 46.5 mi | Milford 2 Milford, UT | Solar | 3 MW | Sune Db24 Llc |
| 46.7 mi | Smithfield 1 Milford, UT | Solar | 5 MW | Greenbacker Renewable Energy Corporation |
| 46.9 mi | Greenville Solar Plant Milford, UT | Solar | 2 MW | Evergreen Wind, Llc |
| 49.4 mi | Manti Lower Manti, UT | Hydroelectric | 1 MW | City Of Manti - (Ut) |
| 49.4 mi | Manti Upper Manti, UT | Hydroelectric | 2 MW | City Of Manti - (Ut) |
Power generation near this area
There are 27 power plants within 50 miles of Meadow, Utah (ZIP 84644), with a combined 2,568 MW of nameplate capacity. Solar is the most common fuel type in this area with 16 of the 27 nearby plants. The closest plant is Pavant Solar, Llc at 5.8 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Utah, visit the Utah state page.
← Search a different location · Printable proximity report →