Power Plants Near 94573 — Rutherford, CA
100 power plants within 50 miles of ZIP 94573 (Rutherford, California). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 38.4585, -122.4225 · County: Napa
| Distance | Plant | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| 4.8 mi | Beringer Saint Helena, CA | Solar | 1 MW | SunStrong Management, LLC |
| 7.8 mi | Pacific Union College BESS Angwin, CA | Other Fossil | 1 MW | ENGIE Storage Services NA LLC |
| 11.4 mi | Calistoga Resilency Center Calistoga, CA | Battery Storage | 19 MW | Calistoga Resiliency Center, LLC |
| 15.7 mi | Keysight - Santa Rosa Santa Rosa, CA | Natural Gas | 5 MW | Bloom Energy |
| 16.2 mi | Santa Rosa Junior College Petaluma Solar Petaluma, CA | Solar | 1 MW | Sonoma County Junior College District |
| 16.2 mi | Kaiser Napa Valley Corporate Dr Fuel Cel Napa, CA | Natural Gas | 5 MW | 2016 ESA Project Company, LLC |
| 17.2 mi | Soscol Ferry Solar Napa, CA | Solar | 2 MW | Soscol Ferry Solar |
| 17.6 mi | Monticello Dam Winters, CA | Hydroelectric | 12 MW | Solano Irrigation District |
| 17.9 mi | Stage Gulch Solar Petaluma, CA | Solar | 1 MW | Stage Gulch Solar, LLC |
| 18.0 mi | Sutter Santa Rosa Solar Santa Rosa, CA | Solar | 1 MW | Sutter Santa Rosa Solar LLC |
| 18.3 mi | Ellis Creek Solar Petaluma, CA | Solar | 4 MW | Ellis Creek Solar, LLC |
| 19.6 mi | Laguna Water Reclamation Facility Santa Rosa, CA | Biomass | 4 MW | City of Santa Rosa - (CA) |
| 20.3 mi | Sutter Home Winery GIR American Canyon, CA | Solar | 1 MW | Westbound Solar 3, LLC |
| 20.7 mi | Sonoma Central Landfill Phase I Petaluma, CA | Biomass | 3 MW | County of Sonoma Dept of Trnsp |
| 20.7 mi | Sonoma Central Landfill Phase II Petaluma, CA | Biomass | 3 MW | County of Sonoma Dept of Trnsp |
| 20.7 mi | Sonoma Central Landfill Phase III Petaluma, CA | Biomass | 2 MW | County of Sonoma Dept of Trnsp |
| 21.8 mi | Bodega Avenue Solar LLC Petaluma, CA | Solar | 2 MW | Bodega Avenue Solar LLC |
| 21.9 mi | Windsor Floating Solar Windsor, CA | Solar | 2 MW | CA Odevi LLC |
| 22.0 mi | Waste Mangement Redwood LFGTE Novato, CA | Biomass | 4 MW | WM Renewable Energy LLC |
| 22.4 mi | Lavio Solar Petaluma, CA | Solar | 1 MW | Lavio Solar, LLC |
| 22.5 mi | Silveira Ranch Road Solar Novato, CA | Solar | 3 MW | Silveira Ranch Road Solar |
| 23.5 mi | American Canyon Solar American Canyon, CA | Solar | 3 MW | RP Napa Solar 1, LLC |
| 23.5 mi | Putah Creek Solar Farm North Winters, CA | Solar | 3 MW | Putah Creek Solar Farms LLC |
| 23.6 mi | Putah Creek Solar Farm Winters, CA | Solar | 2 MW | Solvida Energy Group/Blue Oak Energy |
| 23.6 mi | Anheuser Busch - Fairfield Fairfield, CA | Natural Gas | 3 MW | Bloom Energy |
| 23.7 mi | Anheuser-Busch #2 Fairfield, CA | Wind | 2 MW | Foundation HA Energy Generation, LLC |
| 23.7 mi | Foundation AB Fairfield, CA | Wind | 2 MW | Foundation HA Energy Generation, LLC |
| 23.8 mi | SunEdison Anheuser Busch Fairfield Fairfield, CA | Solar | 1 MW | SunE M5 Holdings LLC |
| 24.0 mi | Cottonwood Solar, LLC Cottonwood Carport Novato, CA | Solar | 1 MW | Onward Energy |
| 24.2 mi | ATT North Watney Fairfield, CA | Natural Gas | 2 MW | Bloom Energy |
| 24.6 mi | Wolfskill Energy Center Fairfield, CA | Natural Gas | 48 MW | Gilroy Energy Center LLC |
| 24.8 mi | SFDK Solar Vallejo, CA | Solar | 6 MW | AES Distributed Energy |
| 25.2 mi | Mariani Packing Vacaville Solar Vacaville, CA | Solar | 1 MW | SunE U6 Holdings LLC |
| 25.3 mi | Solano County Cogen Plant Fairfield, CA | Natural Gas | 3 MW | Solano County - (CA) |
| 25.3 mi | Vacaville Vacaville, CA | Solar | 1 MW | 700Eubanks LLC |
| 25.4 mi | Geothermal 2 Middletown, CA | Geothermal | 110 MW | Northern California Power Agny |
| 25.5 mi | Dissigno Healdsburg FPV, LLC Healdsburg, CA | Solar | 3 MW | Palmetto Power Management LLC |
| 25.6 mi | Bear Canyon Middletown, CA | Battery Storage | 13 MW | Bear Canyon Energy Storage |
| 25.9 mi | Geothermal 1 Middletown, CA | Geothermal | 110 MW | Northern California Power Agny |
| 26.1 mi | Genentech Vacaville Meter #1 Vacaville, CA | Solar | 6 MW | Tesla Inc. |
| 26.2 mi | CDCR (CA) - Solano State Prison Vacaville, CA | Solar | 1 MW | SunE Solano SP Owner, LLC |
| 26.6 mi | Vacaville Hospital Vacaville, CA | Solar | 2 MW | KP Vacaville Solar, LLC |
| 27.0 mi | North Bay Solar 1 Fairfield, CA | Solar | 1 MW | AES Distributed Energy |
| 27.1 mi | Vaca Dixon Solar Station Vacaville, CA | Solar | 2 MW | Pacific Gas & Electric Co. |
| 27.3 mi | CalPeak Power Vaca Dixon Peaker Plant Vacaville, CA | Natural Gas | 61 MW | CalPeak Power, LLC |
| 27.9 mi | West Ford Flat Middletown, CA | Battery Storage | 25 MW | West Ford Flat Energy Storage |
| 28.1 mi | Geysers Unit 5-20 Middletown, CA | Geothermal | 1,236 MW | Geysers Power Co LLC |
| 28.6 mi | Calistoga Power Plant Middletown, CA | Geothermal | 176 MW | Geysers Power Co LLC |
| 29.1 mi | Sonoma California Geothermal Middletown, CA | Geothermal | 78 MW | Geysers Power Co LLC |
| 29.2 mi | Potrero Hills Energy Producers Suisun City, CA | Biomass | 8 MW | Potrero Hills Energy Producers, LLC |
| 29.2 mi | Lake Herman Benicia, CA | Solar | 5 MW | Greenbacker Renewable Energy Corporation |
| 29.8 mi | C&H Sugar Plant Crockett, CA | Other Fossil | 8 MW | C&H Sugar Company Inc |
| 29.9 mi | Crockett Cogen Project Crockett, CA | Natural Gas | 247 MW | Crockett Cogeneration |
| 30.1 mi | Phillips 66 Rodeo Refinery Rodeo, CA | Other Fossil | 55 MW | Phillips 66 Company |
| 30.7 mi | Valero Refinery Cogeneration Unit 1 Benicia, CA | Natural Gas | 50 MW | Valero Refining Co California |
| 30.8 mi | P66 Rodeo Solar Rodeo, CA | Solar | 30 MW | P66 Rodeo Solar |
| 31.0 mi | Foundation Cemex Madison Madison, CA | Wind | 1 MW | Foundation CA Fund V Manager, LLC |
| 31.2 mi | Bio-Rad Hercules, CA | Solar | 2 MW | Vista Solar, Inc. |
| 32.0 mi | Bottle Rock Power Cobb, CA | Geothermal | 55 MW | Mayacma Geothermal |
| 32.8 mi | Foundation Superior Farms Dixon, CA | Wind | 1 MW | Foundation CA Fund VI Manager LLC |
| 33.1 mi | Clear Lake Hydro Project Clearlake, CA | Hydroelectric | 3 MW | Yolo County Flood Control WCD |
| 33.4 mi | G2 Energy Hay Rd Vacaville, CA | Biomass | 2 MW | G2 Energy LLC |
| 33.9 mi | Martinez Sulfuric Acid Regeneration Plt Martinez, CA | Other Fossil | 4 MW | Eco Services Corp. |
| 34.0 mi | Nove Power Plant Richmond, CA | Biomass | 3 MW | Nove Investments I LLC |
| 34.2 mi | Lambie Energy Center Suisun, CA | Natural Gas | 47 MW | Gilroy Energy Center LLC |
| 34.2 mi | Creed Energy Center Suisun, CA | Natural Gas | 48 MW | Creed Energy Center LLC |
| 34.9 mi | Martinez Refining Martinez, CA | Natural Gas | 100 MW | Martinez Refining Co |
| 35.2 mi | Goose Haven Energy Center Suisun, CA | Natural Gas | 48 MW | Goose Haven Energy Center |
| 35.4 mi | West Village Solar - Array 1Community So Davis, CA | Solar | 1 MW | CHF-Davis I, LLC |
| 35.4 mi | West Village Solar - Array 2 Community S Davis, CA | Solar | 1 MW | CHF-Davis I, LLC |
| 35.5 mi | Marin Clean Energy Solar One Richmond, CA | Solar | 11 MW | AES Distributed Energy |
| 35.7 mi | Richmond Cogen Richmond, CA | Natural Gas | 174 MW | Chevron Products Company-Richmond |
| 35.8 mi | Aidlin Geothermal Power Plant Middletown, CA | Geothermal | 25 MW | Geysers Power Co LLC |
| 35.9 mi | Marathon Bay Area Cogen Martinez, CA | Natural Gas | 114 MW | Tesoro Marketing & Refining Co. LLC (Martinez) |
| 36.5 mi | Asti Cloverdale, CA | Solar | 1 MW | SunStrong Management, LLC |
| 36.5 mi | Central San Martinez, CA | Solar | 2 MW | Rec Csd, LLC |
| 36.6 mi | Warm Springs Hydro Project Geyserville, CA | Hydroelectric | 3 MW | Sonoma County Water Agency - (CA) |
| 36.9 mi | UC Davis South Campus Davis, CA | Solar | 13 MW | Solar Star California XXXII, LLC |
| 37.0 mi | Shiloh Wind Project 2 LLC Birds Landing, CA | Wind | 150 MW | EDF Renewable Asset Holdings, Inc. |
| 37.0 mi | Shiloh III Wind Project LLC Birds Landing, CA | Wind | 103 MW | EDF Renewable Asset Holdings, Inc. |
| 37.1 mi | CCCSD Wastewater Treatment Plnt Martinez, CA | Natural Gas | 4 MW | Central Contra Costa Sanitary District |
| 37.5 mi | CA Dept of Public Health at Richmond Richmond, CA | Solar | 2 MW | California PV Energy LLC |
| 37.9 mi | Shiloh IV Wind Project LLC Birds Landing, CA | Wind | 103 MW | EDF Renewable Asset Holdings, Inc. |
| 38.8 mi | Cloverdale Solar Center Cloverdale, CA | Solar | 1 MW | Adapture Renewables, Inc. |
| 38.8 mi | Cloverdale Solar I Cloverdale, CA | Solar | 2 MW | Altus Power America Management, LLC |
| 38.9 mi | Shiloh I Wind Project Rio Vista, CA | Wind | 150 MW | Avangrid Power LLC |
| 39.4 mi | Bear Creek Solar (Orinda) Orinda, CA | Solar | 5 MW | Solar Star Bear Creek, LLC |
| 39.5 mi | Grassland 3&4 Solar Project Davis, CA | Solar | 2 MW | Yolo County of - (CA) |
| 39.5 mi | Grassland 1&2 Solar Project Davis, CA | Solar | 2 MW | Yolo County of - (CA) |
| 39.6 mi | FPL Energy Montezuma Winds LLC Birds Landing, CA | Wind | 37 MW | FPL Energy Montezuma Wind |
| 39.7 mi | EDF Renewable Windfarm V Inc Birds Landing, CA | Wind | 16 MW | EDF Renewable Asset Holdings, Inc. |
| 39.9 mi | Yolo County Solar Project Woodland, CA | Solar | 1 MW | Yolo County of - (CA) |
| 40.1 mi | High Winds LLC Birds Landing, CA | Wind | 162 MW | FPLE High Winds, LLC |
| 40.2 mi | Montezuma Wind II Birds Landing, CA | Wind | 78 MW | NextEra Energy Montezuma Wind II, LLC |
| 40.3 mi | Woodland Biomass Power Ltd Woodland, CA | Biomass | 28 MW | DTE Energy Services-Woodland |
| 40.8 mi | Target Woodland Solar Project Woodland, CA | Solar | 2 MW | MN8 Energy LLC |
| 40.9 mi | MM Yolo Power Woodland, CA | Biomass | 4 MW | Yolo County Community Services Department |
| 41.0 mi | Diablo Energy Storage Pittsburg, CA | Other Fossil | 200 MW | Diablo Energy Storage, LLC |
| 41.1 mi | Ameresco Keller Canyon Bay Point, CA | Biomass | 4 MW | AMERESCO Keller Canyon LLC |
| 41.1 mi | Walgreens Woodland Distribution Center Woodland, CA | Solar | 1 MW | SunE WG45 Woodland LLC |
Power generation near this area
There are 100 power plants within 50 miles of Rutherford, California (ZIP 94573), with a combined 4,092 MW of nameplate capacity. Solar is the most common fuel type in this area with 43 of the 100 nearby plants. The closest plant is Beringer at 4.8 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in California, visit the California state page.
← Search a different location · Printable proximity report →