Power Plants Near 97039 — Moro, OR
55 power plants within 50 miles of ZIP 97039 (Moro, Oregon). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 45.4853, -120.6957 · County: Sherman
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 5.4 mi | Golden Hill Wind Wasco, OR | Wind | 201 MW | Avangrid Power Llc |
| 6.3 mi | Hay Canyon Wind Power Llc Wasco, OR | Wind | 101 MW | Avangrid Power Llc |
| 7.7 mi | Klondike Windpower Ii Wasco, OR | Wind | 75 MW | Avangrid Power Llc |
| 8.3 mi | Wyeast Solar Wasco, OR | Solar | 10 MW | Avangrid Power Llc |
| 8.6 mi | Klondike Wind Power Wasco, OR | Wind | 25 MW | Avangrid Power Llc |
| 9.0 mi | Biglow Solar Generation And Bess Klondike, OR | Solar | — | Bigl Bn, Llc |
| 9.6 mi | Patu Wind Farm Llc Wasco, OR | Wind | 9 MW | Patu Wind Farm Llc |
| 10.6 mi | Star Point Wind Project Llc Wasco, OR | Wind | 99 MW | Avangrid Power Llc |
| 11.5 mi | Klondike Windpower Iii Wasco, OR | Wind | 298 MW | Avangrid Power Llc |
| 12.1 mi | Summit Ridge I Wind Farm Wasco, OR | Wind | — | Pattern Operators Lp |
| 12.5 mi | Biglow Canyon Wind Farm Wasco, OR | Wind | 450 MW | Portland General Electric Co |
| 16.0 mi | John Day Rufus, OR | Hydroelectric | 2,160 MW | Usace Northwestern Division |
| 18.0 mi | Windy Flats Wind Project Centerville, WA | Wind | 262 MW | Windy Flats Partners Llc |
| 18.4 mi | Linden Wind Energy Project Goldendale, WA | Wind | 50 MW | Los Angeles Department Of Water & Power |
| 20.0 mi | Cedar Island Solar Llc Grass Valley, OR | Solar | — | Cedar Island Solar Llc |
| 20.3 mi | Waste Management Columbia Ridge Lfgte Arlington, OR | Biomass | 13 MW | Wm Renewable Energy Llc |
| 22.2 mi | Goodnoe Hills Goldendale, WA | Wind | 103 MW | Pacificorp |
| 22.5 mi | Wheat Field Wind Power Project Arlington, OR | Wind | 103 MW | Wheat Field Wind Power Project Llc |
| 23.0 mi | The Dalles The Dalles, OR | Hydroelectric | 1,820 MW | Usace Northwestern Division |
| 23.1 mi | Dalles Dam North Fishway Project The Dalles, OR | Hydroelectric | 7 MW | Northern Wasco County Pud |
| 23.5 mi | Goldendale Generating Station Goldendale, WA | Natural Gas | 303 MW | Puget Sound Energy Inc |
| 23.9 mi | Sunset Solar Wasco, OR | Solar | — | Avangrid Power Llc |
| 24.0 mi | Leaning Juniper Wind Power Ii Arlington, OR | Wind | 199 MW | Avangrid Power Llc |
| 24.8 mi | Condon Windpower Llc Condon, OR | Wind | 50 MW | Allete Clean Energy |
| 25.3 mi | Montague Solar Arlington, OR | Solar | 162 MW | Avangrid Power Llc |
| 26.0 mi | Bakeoven Solar Maupin, OR | Solar | — | Avangrid Power Llc |
| 26.0 mi | Daybreak Solar Maupin, OR | Solar | — | Avangrid Power Llc |
| 26.2 mi | Leaning Juniper Arlington, OR | Wind | 110 MW | Pacificorp |
| 27.8 mi | Tuolumne Wind Project Goldendale, WA | Wind | 136 MW | Turlock Irrigation District |
| 28.2 mi | Harvest Wind Project Roosevelt, WA | Wind | 99 MW | Harvest Wind Project Tic |
| 28.5 mi | White Creek Wind Farm Roosevelt, WA | Wind | 204 MW | White Creek Wind 1 Llc |
| 28.6 mi | Carriger Goldendale, WA | Solar | — | Cypress Creek Renewables |
| 28.8 mi | Arlington Wind Power Project Arlington, OR | Wind | 103 MW | Arlington Wind Power Project Llc |
| 30.1 mi | Montague Wind Power Facility Llc Arlington, OR | Wind | 200 MW | Avangrid Power Llc |
| 31.2 mi | Deschutes Solar And Bess Tbd, OR | Battery Storage | — | Dech Bn, Llc |
| 31.7 mi | Pebble Springs Wind Llc Wasco, OR | Wind | 99 MW | Avangrid Power Llc |
| 32.3 mi | Lund Hill Klickitat, WA | Wind | — | Avangrid Power Llc |
| 32.3 mi | Lund Hill Solar Bickleton, WA | Solar | 150 MW | Avangrid Power Llc |
| 33.5 mi | South Hurlburt Wind Llc Arlington, OR | Wind | 290 MW | Caithness Shepherds Flat Llc |
| 34.0 mi | Horseshoe Bend Wind Llc Arlington, OR | Wind | 290 MW | Caithness Shepherds Flat Llc |
| 34.0 mi | Big Horn Wind Project Bickelton, WA | Wind | 199 MW | Avangrid Power Llc |
| 34.1 mi | North Hurlburt Wind Llc Arlington, OR | Wind | 265 MW | Caithness Shepherds Flat Llc |
| 35.4 mi | Big Horn Wind Ii Bickleton, WA | Wind | 50 MW | Avangrid Power Llc |
| 36.0 mi | Willow Creek Energy Center Lone, OR | Wind | 72 MW | Invenergy Services Llc |
| 37.4 mi | Juniper Canyon I Wind Project Bickleton, WA | Wind | 151 MW | Avangrid Power Llc |
| 39.0 mi | Threemile Canyon Boardman, OR | Wind | 10 MW | Threemile Canyon Wind I, Llc |
| 41.4 mi | Threemile Digester Boardman, OR | Natural Gas | 5 MW | Tmf-Rig, Llc |
| 41.9 mi | Powerdale Hood River, OR | Hydroelectric | — | Pacificorp |
| 41.9 mi | Copper Dam Plant Hood River, OR | Hydroelectric | 3 MW | Farmer's Irrigation District |
| 43.1 mi | Peters Drive Plant Hood River, OR | Hydroelectric | 2 MW | Farmer's Irrigation District |
| 43.8 mi | Middle Fork Irrigation District Parkdale, OR | Hydroelectric | 3 MW | Middle Fork Irrigation Dist |
| 44.3 mi | Condit White Salmon, WA | Hydroelectric | — | Pacificorp |
| 45.1 mi | Carty Generating Station Boardman, OR | Natural Gas | 500 MW | Portland General Electric Co |
| 45.2 mi | Boardman Boardman, OR | Coal | — | Portland General Electric Co |
| 49.1 mi | Tower Solar, Llc Boardman, OR | Solar | — | Avangrid Power Llc |
Power generation near this area
There are 55 power plants within 50 miles of Moro, Oregon (ZIP 97039), with a combined 9,439 MW of nameplate capacity. Wind is the most common fuel type in this area with 31 of the 55 nearby plants. The closest plant is Golden Hill Wind at 5.4 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Oregon, visit the Oregon state page.
← Search a different location · Printable proximity report →