758th largest plant in North Carolina · 10231st nationally
233 Randolph 74 Solar I, Llc is a solar power plant in North Carolina with a nameplate capacity of 2.0 MW. It generates roughly 3.7k MWh per year — enough to power about 351 average U.S. homes.
Its capacity factor of 21% reflects intermittent or peaking operation.
| Plant Name | 233 Randolph 74 Solar I, Llc |
|---|---|
| Operator | 233 Randolph 74 Solar I, Llc |
| City | Shelby |
| County | Cleveland County |
| State | North Carolina |
| ZIP | 28150 |
| Coordinates | 35.31194, -81.59055 |
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| ID | Technology | Fuel | Capacity | Status | Online |
|---|---|---|---|---|---|
| CAPE1 | Solar Photovoltaic | Solar | 2.0 MW | Operating | 2022 |
| Owner | Location | Share |
|---|---|---|
| Lilly Hills Holding, Llc | Huntersville, NC | 10000.0% |
Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.
| NERC Region | SERC |
|---|---|
| Balancing Authority | Duke Energy Carolinas |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.