Worcester, Massachusetts · Plant code 63469

Alicea Solar Project Hybrid CSG

Alicea Solar Project Hybrid CSG is a solar plant in Worcester, Massachusetts. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

Primary fuel Solar

Route-friendly label and badge.

Total capacity 4 MW

Plant nameplate capacity.

Annual generation 3,644 MWh

Annual output from imported EIA and EPA records.

Capacity factor 12%

A simple way to compare utilization.

Operations

Operations details

Sector IPP Non-CHP

Utility, IPP, industrial, or commercial style ownership.

Status Operating

Current operating status in the imported records.

Online year 2,020

Useful for technology-vintage context.

Location Southbridge, Massachusetts

County and state routing anchor.

Emissions

Emissions details

CO2 0 tons

Annual plant-level total.

SO2 0 tons

Annual sulfur dioxide.

NOx 0 tons

Annual nitrogen oxides.

CO2 rate 0 lbs/MWh

Emission intensity, when available.

Fuel mix

Generation by fuel at the site.

Solar 3,670 MWh · 101% of generation
Mwh 0 MWh · 0% of generation
Other -26 MWh · -1% of generation

Ownership

Who owns the plant.

Owner AES Distributed Energy

100%

Generators

Generator-level detail

Generator Technology Fuel Capacity Status Online
ALICA Solar Photovoltaic Solar 2 MW Operating 2,020
BATT Batteries MWH 2 MW Operating 2,020

Generation trend

Monthly output pattern

106 MWh
Jan
267 MWh
Feb
293 MWh
Mar
305 MWh
Apr
393 MWh
May
429 MWh
Jun
406 MWh
Jul
370 MWh
Aug
302 MWh
Sep
373 MWh
Oct
212 MWh
Nov
188 MWh
Dec

Nearby plants

Closest comparison sites

Worcester, Massachusetts

ZPD-PT Solar Project 2017-023 LLC Hybrid

Solar

ZPD-PT Solar Project 2017-023 LLC Hybrid is a solar plant in Worcester, Massachusetts. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

5 MW 3,542 MWh 0 tons CO2
AES Distributed Energy 0.2 mi away

Worcester, Massachusetts

Dudley River Solar, LLC CSG

Solar

Dudley River Solar, LLC CSG is a solar plant in Worcester, Massachusetts. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

1 MW 1,699 MWh 0 tons CO2
Dudley River Solar, LLC 0.4 mi away

Worcester, Massachusetts

West A&B Solar Project Hybrid CSG

Solar

West A&B Solar Project Hybrid CSG is a solar plant in Worcester, Massachusetts. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

5 MW 4,727 MWh 0 tons CO2
AES Distributed Energy 0.4 mi away

Worcester, Massachusetts

Dudley River 3 Solar, LLC CSG

Solar

Dudley River 3 Solar, LLC CSG is a solar plant in Worcester, Massachusetts. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

1 MW 1,701 MWh 0 tons CO2
Dudley River 3 Solar, LLC 0.4 mi away

Related routes

Context around this plant