Amazon Bakersfield 1 Solar Project

☀ SolarIPP Non-CHP5 MW capacity

936th largest plant in California · 6771st nationally

Amazon Bakersfield 1 Solar Project is a solar power plant in California with a nameplate capacity of 5.9 MW.

Capacity6 MWnameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameAmazon Bakersfield 1 Solar Project
OperatorSolar Star Prime 3, Llc
CityBakersfiled
CountyKern County
StateCalifornia
ZIP93308
Coordinates35.44662, -119.05089

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolar

Generators (2)

IDTechnologyFuelCapacityStatusOnline
ABFSPSolar PhotovoltaicSolar4.3 MWOperating2024
ABSBABatteriesBattery1.6 MWOperating2024

Ownership

OwnerLocationShare
Solar Star Prime 3, LlcHouston, TX10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Kern County

View all plants in Kern County →

Explore more