Berrenda Mesa Water District

☀ SolarIPP Non-CHP6 MW capacity

911th largest plant in California · 6594th nationally

Berrenda Mesa Water District is a solar power plant in California with a nameplate capacity of 6.4 MW.

Capacity6 MWnameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameBerrenda Mesa Water District
OperatorThe Greater Light Usa Llc
CityLost Hills
CountyKern County
StateCalifornia
ZIP93249
Coordinates35.61334, -119.86676

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBattery Storage

Generators (1)

IDTechnologyFuelCapacityStatusOnline
PV1Solar PhotovoltaicSolar6.4 MWOperating2023

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Kern County

View all plants in Kern County →

Explore more