Worcester, Massachusetts · Plant code 64170

BWC Muddy Brook, LLC Hybrid

BWC Muddy Brook, LLC Hybrid is a solar plant in Worcester, Massachusetts. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

Primary fuel Solar

Route-friendly label and badge.

Total capacity 2 MW

Plant nameplate capacity.

Annual generation 1,896 MWh

Annual output from imported EIA and EPA records.

Capacity factor 10%

A simple way to compare utilization.

Operations

Operations details

Sector IPP Non-CHP

Utility, IPP, industrial, or commercial style ownership.

Status Operating

Current operating status in the imported records.

Online year 2,021

Useful for technology-vintage context.

Location Mendon, Massachusetts

County and state routing anchor.

Emissions

Emissions details

CO2 0 tons

Annual plant-level total.

SO2 0 tons

Annual sulfur dioxide.

NOx 0 tons

Annual nitrogen oxides.

CO2 rate 0 lbs/MWh

Emission intensity, when available.

Fuel mix

Generation by fuel at the site.

Solar 1,919 MWh · 101% of generation
Mwh 0 MWh · 0% of generation
Other -23 MWh · -1% of generation

Ownership

Who owns the plant.

Owner AES Distributed Energy

100%

Generators

Generator-level detail

Generator Technology Fuel Capacity Status Online
MBES Batteries MWH 1 MW Operating 2,021
MBPV Solar Photovoltaic Solar 1 MW Operating 2,021

Generation trend

Monthly output pattern

34 MWh
Jan
148 MWh
Feb
164 MWh
Mar
183 MWh
Apr
226 MWh
May
253 MWh
Jun
216 MWh
Jul
199 MWh
Aug
136 MWh
Sep
175 MWh
Oct
111 MWh
Nov
51 MWh
Dec

Nearby plants

Closest comparison sites

Worcester, Massachusetts

Mendon

Solar

Mendon is a solar plant in Worcester, Massachusetts. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

3 MW 3,809 MWh 0 tons CO2
BWC Box Pond LLC 0.2 mi away

Norfolk, Massachusetts

Bellingham Cogeneration Facility

Natural Gas

Bellingham Cogeneration Facility is a natural gas plant in Norfolk, Massachusetts. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

387 MW 367,825 MWh 52,536 tons CO2
Northeast Energy Associates LP 1.2 mi away

Norfolk, Massachusetts

Kearsarge William Way

Solar

Kearsarge William Way is a solar plant in Norfolk, Massachusetts. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

7 MW 7,394 MWh 0 tons CO2
Kearsarge William Way LLC 1.2 mi away

Worcester, Massachusetts

BWC Wading River One, Two, Three CSG

Solar

BWC Wading River One, Two, Three CSG is a solar plant in Worcester, Massachusetts. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

3 MW 5,033 MWh 0 tons CO2
Ameresco BWC Wading River LLC 1.3 mi away

Related routes

Context around this plant