Electric generating plantEIA plant no. 63011

Cronin Road Solar 1, LLC CSG Hybrid

Type
Solar Photovoltaic
Nameplate capacity
3.0 MW
Units
2
In service since
2020
Operator
AES Distributed Energy
Location
Warren, Worcester County, Massachusetts
Rated 306th largest in Massachusetts · 9893rd of 14,761 in the U.S. · by nameplate

Cronin Road Solar 1, LLC CSG Hybrid is a solar power plant in Massachusetts with a nameplate capacity of 3.0 MW. It generates roughly 3.5k MWh per year — enough to power about 332 average U.S. homes.

Its capacity factor of 13% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Cronin Road Solar 1, LLC CSG Hybrid could make 26.3k MWh. In 2023 it made 3.5k MWh — the same as running at full power 13 hours in every 100.

Nameplate, full year26.3k MWh3.0 MW × 8,760 hours
Actually generated3.5k MWhEPA eGRID, 2023 · ≈332 homes

Peaking or variableCapacity factor 13%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A battery storage site

charge middaydischarge evening1battery containers2inverters, both ways3the grid
  1. Rows of shipping-container-sized battery racks store electricity chemically.
  2. Inverters charge them from the grid — often midday, when solar is plentiful and cheap.
  3. In the evening peak the same inverters run the other way and send power back.

Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

SolarBiomass

Location

Address355 Cronin Road
CityWarren
CountyWorcester County
StateMassachusetts
ZIP01585
Coordinates42.17630, -72.15400
OperatorAES Distributed Energy

Generators (2)

IDTechnologyFuelNameplate capacityStatusOnline
BESSBatteriesBattery1.5 MWOperating2020
CRONISolar PhotovoltaicSolar1.5 MWOperating2020

Grid context

NERC RegionNPCC
Balancing AuthorityISO New England Inc.

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Worcester County

View all plants in Worcester County →

Explore more