Electric generating plantEIA plant no. 67293

EDF - Liberty NY - Real Term CSG

Type
Solar Photovoltaic
Nameplate capacity
2.1 MW
Units
2
In service since
2023
Operator
Esny-Rt-Elmsford, LLC
Location
Elmsford, Westchester County, New York
Rated 848th largest in New York · 11053rd of 14,761 in the U.S. · by nameplate

EDF - Liberty NY - Real Term CSG is a solar power plant in New York with a nameplate capacity of 2.1 MW. It generates roughly 526 MWh per year — enough to power about 50 average U.S. homes.

Its capacity factor of 3% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, EDF - Liberty NY - Real Term CSG could make 18.4k MWh. In 2023 it made 526 MWh — the same as running at full power 3 hours in every 100.

Nameplate, full year18.4k MWh2.1 MW × 8,760 hours
Actually generated526 MWhEPA eGRID, 2023 · ≈50 homes

Peaking or variableCapacity factor 3%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilSolar

Location

Address5 Warehouse Lane
CityElmsford
CountyWestchester County
StateNew York
ZIP10523
Coordinates41.06647, -73.82251
OperatorEsny-Rt-Elmsford, LLC

Generators (2)

IDTechnologyFuelNameplate capacityStatusOnline
71334Solar PhotovoltaicSolar1.8 MWOperating2023
71335Solar PhotovoltaicSolar0.3 MWOperating2023

Grid context

NERC RegionNPCC
Balancing AuthorityNew York Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Westchester County

View all plants in Westchester County →

Data centers near EDF - Liberty NY - Real Term CSG

Data centerOperatorDistance
Data center, 65 3rd Avenue, OrangeburgNot recorded7.8 mi
fifteenfortyseven CSR ORNY1fifteenfortyseven Critical Systems Realty8.3 mi
Bloomberg Data CenterBloomberg8.8 mi
Databank LGA3Databank8.9 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map