Grand Prix Solar is a solar power plant in New York with a nameplate capacity of 1.6 MW. It generates roughly 608 MWh per year — enough to power about 57 average U.S. homes.
Its capacity factor of 4% reflects intermittent or peaking operation.
Run flat out every hour of the year, Grand Prix Solar could make 14.0k MWh. In 2023 it made 608 MWh — the same as running at full power 4 hours in every 100.
Peaking or variableCapacity factor 4%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 333 North Bedford Rd |
|---|---|
| City | Mt. Kisco |
| County | Westchester County |
| State | New York |
| ZIP | 10549 |
| Coordinates | 41.21125, -73.72252 |
| Operator | Diamond Properties |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| GPS | Solar Photovoltaic | Solar | 1.6 MW | Operating | 2014 |
| Owner | Location | Share |
|---|---|---|
| Grand Prix NY Racing LLC | Mt Kisco, NY | 4871.0% |
| New York Sports Management | Mt. Kiosco, NY | 3208.0% |
| Photo File Inc | Mt Kisco, NY | 692.0% |
| Dp 21 LLC | Mt Kisco, NY | 461.0% |
| Safe Haven Partners LLC | Mt Kisco, NY | 461.0% |
| RDI Electronics | Mt. Kiosco, NY | 307.0% |
Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.
| NERC Region | NPCC |
|---|---|
| Balancing Authority | New York Independent System Operator |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.
| Data center | Distance |
|---|---|
| amnet Data Center | 13.5 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map