Electric generating plantEIA plant no. 58383

Hyder II Hybrid

Type
Solar Photovoltaic
Nameplate capacity
28.0 MW
Units
2
In service since
2013–2023
Operator
Arizona Public Service Co
Location
Hyder, Yuma County, Arizona
Rated 129th largest in Arizona · 4646th of 14,761 in the U.S. · by nameplate

Hyder II Hybrid is a solar power plant in Arizona with a nameplate capacity of 28.0 MW. It generates roughly 30.3k MWh per year — enough to power about 2,882 average U.S. homes.

Its capacity factor of 12% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Hyder II Hybrid could make 245.3k MWh. In 2023 it made 30.3k MWh — the same as running at full power 12 hours in every 100.

Nameplate, full year245.3k MWh28.0 MW × 8,760 hours
Actually generated30.3k MWhEPA eGRID, 2023 · ≈2,882 homes

Peaking or variableCapacity factor 12%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A battery storage site

charge middaydischarge evening1battery containers2inverters, both ways3the grid
  1. Rows of shipping-container-sized battery racks store electricity chemically.
  2. Inverters charge them from the grid — often midday, when solar is plentiful and cheap.
  3. In the evening peak the same inverters run the other way and send power back.

Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

SolarBattery Storage

Location

Address75100 E County 14 1/2 St
CityHyder
CountyYuma County
StateArizona
ZIP85333
Coordinates33.02700, -113.34890
OperatorArizona Public Service Co

Generators (2)

IDTechnologyFuelNameplate capacityStatusOnline
H214MBatteriesBattery14.0 MWOperating2023
PV1Solar PhotovoltaicSolar14.0 MWOperating2013

Grid context

NERC RegionWECC
Balancing AuthorityArizona Public Service Company

About Solar plants