Hyder Ii Hybrid

☀ SolarElectric Utility28 MW capacity

94th largest plant in Arizona · 4266th nationally

Hyder Ii Hybrid is a solar power plant in Arizona with a nameplate capacity of 28.0 MW. It generates roughly 30.3k MWh per year — enough to power about 2,882 average U.S. homes.

Its capacity factor of 12% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%12%
Peaking — intermittent or backup
Capacity28 MWnameplate
Annual Generation30.3k MWhEPA eGRID
Capacity Factor12%of theoretical max
Annual CO₂metric tons

Location

Plant NameHyder Ii Hybrid
OperatorArizona Public Service Co
CityHyder
CountyYuma County
StateArizona
ZIP85333
Coordinates33.02700, -113.34890

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

SolarBattery Storage

Generators (2)

IDTechnologyFuelCapacityStatusOnline
H214MBatteriesBattery14.0 MWOperating2023
PV1Solar PhotovoltaicSolar14.0 MWOperating2013

Grid context

NERC RegionWECC
Balancing AuthorityArizona Public Service Company