Electric generating plantEIA plant no. 58836

Lakeswind Power Partners

Type
Onshore Wind Turbine
Nameplate capacity
51.8 MW
Units
1
In service since
2014
Operator
Lakeswind Power Partners
Location
Pelican Rapids, Clay County, Minnesota
Rated 62nd largest in Minnesota · 3884th of 14,761 in the U.S. · by nameplate

Lakeswind Power Partners is a wind power plant in Minnesota with a nameplate capacity of 51.8 MW. It generates roughly 154.7k MWh per year — enough to power about 14,733 average U.S. homes.

Its capacity factor of 34% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Lakeswind Power Partners could make 453.8k MWh. In 2023 it made 154.7k MWh — the same as running at full power 34 hours in every 100.

Nameplate, full year453.8k MWh51.8 MW × 8,760 hours
Actually generated154.7k MWhEPA eGRID, 2023 · ≈14,733 homes

Peaking or variableCapacity factor 34%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

OilWindSolar

Location

Address29040 120th Ave. S.
CityPelican Rapids
CountyClay County
StateMinnesota
ZIP56572
Coordinates46.71806, -96.21194
OperatorLakeswind Power Partners

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
LW1Onshore Wind TurbineWind51.8 MWOperating2014

Grid context

NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc..

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Clay County

View all plants in Clay County →