Electric generating plantEIA plant no. 67093

Mojave 16/17/18 BESS

Type
Other Fossil
Nameplate capacity
77.0 MW
Units
1
In service since
2020
Operator
Terra-Gen Operating Co-BESS 2
Location
Mojave, Kern County, California
Rated 346th largest in California · 3236th of 14,761 in the U.S. · by nameplate

Mojave 16/17/18 BESS is a other fossil power plant in California with a nameplate capacity of 77.0 MW.

The 77.0 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A battery storage site

charge middaydischarge evening1battery containers2inverters, both ways3the grid
  1. Rows of shipping-container-sized battery racks store electricity chemically.
  2. Inverters charge them from the grid — often midday, when solar is plentiful and cheap.
  3. In the evening peak the same inverters run the other way and send power back.

Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

WindSolarBattery Storage

Location

Address8017 Oak Creek Road
CityMojave
CountyKern County
StateCalifornia
ZIP93501
Coordinates35.04417, -118.27556
OperatorTerra-Gen Operating Co-BESS 2

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
GEN 1BatteriesBattery77.0 MWOperating2020

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Other Fossil plants

Mojave 16/17/18 BESS is a federally registered power generation facility in California.

Other plants in Kern County

View all plants in Kern County →

Explore more