Quinto Solar Pv Project

☀ SolarIPP Non-CHP108 MW capacity

241st largest plant in California · 2334th nationally

Quinto Solar Pv Project is a solar power plant in California with a nameplate capacity of 108 MW. It generates roughly 213.5k MWh per year — enough to power about 20,337 average U.S. homes.

Its capacity factor of 23% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%23%
Peaking — intermittent or backup
Capacity108 MWnameplate
Annual Generation213.5k MWhEPA eGRID
Capacity Factor23%of theoretical max
Annual CO₂metric tons

Location

Plant NameQuinto Solar Pv Project
OperatorArevon Energy, Inc.
CityGustine
CountyMerced County
StateCalifornia
ZIP95322
Coordinates37.13028, -121.05222

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricWindSolarBiomassBattery Storage

Generators (1)

IDTechnologyFuelCapacityStatusOnline
SSC13Solar PhotovoltaicSolar108 MWOperating2015

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants