Merced, California · Plant code 59555

Vega Solar

Vega Solar is a solar plant in Merced, California. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

Primary fuel Solar

Route-friendly label and badge.

Total capacity 20 MW

Plant nameplate capacity.

Annual generation 51,099 MWh

Annual output from imported EIA and EPA records.

Capacity factor 27%

A simple way to compare utilization.

Operations

Operations details

Sector IPP Non-CHP

Utility, IPP, industrial, or commercial style ownership.

Status Operating

Current operating status in the imported records.

Online year 2,015

Useful for technology-vintage context.

Location Los Banos, California

County and state routing anchor.

Emissions

Emissions details

CO2 0 tons

Annual plant-level total.

SO2 0 tons

Annual sulfur dioxide.

NOx 0 tons

Annual nitrogen oxides.

CO2 rate 0 lbs/MWh

Emission intensity, when available.

Fuel mix

Generation by fuel at the site.

Solar 51,099 MWh · 100% of generation

Ownership

Who owns the plant.

Owner Vega Solar, LLC

100%

Generators

Generator-level detail

Generator Technology Fuel Capacity Status Online
VEGA1 Solar Photovoltaic Solar 20 MW Operating 2,015

Generation trend

Monthly output pattern

1,840 MWh
Jan
2,730 MWh
Feb
4,200 MWh
Mar
5,265 MWh
Apr
6,588 MWh
May
6,398 MWh
Jun
6,215 MWh
Jul
5,602 MWh
Aug
4,134 MWh
Sep
3,764 MWh
Oct
2,533 MWh
Nov
1,830 MWh
Dec

Nearby plants

Closest comparison sites

Merced, California

Merced 1 PV

Solar

Merced 1 PV is a solar plant in Merced, California. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

3 MW 6,530 MWh 0 tons CO2
GL Merced 2, LLC 5.4 mi away

Fresno, California

Oro Loma

Solar

Oro Loma is a solar plant in Fresno, California. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

20 MW 25,493 MWh 0 tons CO2
Consolidated Edison Development Inc. 9.1 mi away

Merced, California

Wright Solar Park

Solar

Wright Solar Park is a solar plant in Merced, California. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

200 MW 337,875 MWh 0 tons CO2
KKR/GA 9.5 mi away

Merced, California

Dos Palos

Solar

Dos Palos is a solar plant in Merced, California. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

1 MW 1,561 MWh 0 tons CO2
Greenbacker Renewable Energy Corporation 11.4 mi away

Related routes

Context around this plant