Merced County, California has 29 power plants totaling 1,036 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.
| Plant | City | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| W R Gianelli | Gustine | Hydroelectric | 424 MW | California Dept. of Water Resources |
| Wright Solar Park | Los Banos | Solar | 200 MW | Wright Solar Park LLC |
| Gonzaga Ridge Wind Farm | Hollister | Wind | 133 MW | Gonzaga Ridge Wind Farm, LLC |
| Quinto Solar PV Project | Gustine | Solar | 108 MW | Arevon Energy, Inc. |
| Gonzaga Ridge Battery Facility | Hollister | Battery Storage | 51.8 MW | Gonzaga Ridge Battery Facility, LLC |
| ONeill | Los Banos | Hydroelectric | 25.2 MW | U S Bureau of Reclamation |
| Vega Solar | Los Banos | Solar | 20.0 MW | Vega Solar, LLC |
| Dinosaur Point | Los Banos | Wind | 17.4 MW | International Turbine Res Inc |
| El Nido Facility | El Nido | Biomass | 12.5 MW | Merced Power LLC |
| UC Merced Solar Hybrid | Merced | Solar | 5.0 MW | MN8 Energy LLC |
| Merced Pipeline | Merced | Solar | 4.1 MW | Maas Energy Works |
| Merced Falls | Snelling | Hydroelectric | 3.4 MW | Merced Irrigation District |
| Merced 1 PV | Los Banos | Solar | 3.0 MW | ZGlobal Inc |
| East Cleveland Road Solar | El Nido | Solar | 3.0 MW | RPCA Solar 7, LLC |
| Dos Palos Clean Power | Dos Palos | Solar | 3.0 MW | Dos Palos Clean Power LLC |
| Parker | Snelling | Hydroelectric | 2.7 MW | Merced Irrigation District |
| West Tambo Clean Power II | Livingston | Solar | 2.0 MW | West Tambo Clean Power II |
| Merced 2 BESS | Dos Palos | Battery Storage | 2.0 MW | ZGlobal Inc |
| Godinho Dairy Digester | Los Banos | Biomass | 2.0 MW | Aligned Digesters Co., LLC |
| Lara 2 Hybrid | Los Banos | Battery Storage | 1.6 MW | ZGlobal Inc |
| 2097 Helton Solar Project | Merced | Solar | 1.5 MW | Solarenewal LLC |
| Merced Solar LLC | Merced | Solar | 1.5 MW | Ecos Energy LLC |
| Mission Solar LLC | Merced | Solar | 1.5 MW | Ecos Energy LLC |
| Sun Harvest Solar NDP1 | Dos Palos | Solar | 1.5 MW | Altus Power America Management, LLC |
| Henry Miller RD | Dos Palos | Solar | 1.5 MW | Henry Miller Reclamation District |
| City of Atwater NEM | Atwater | Solar | 1.5 MW | SoCore Energy LLC |
| Five H Farms Solar Array | Merced | Solar | 1.0 MW | Maas Energy Works |
| Broadway 3 - UC Merced 1 | Merced | Solar | 1.0 MW | MN8 Energy LLC |
| Dos Palos Cooperative Gin | Dos Palos | Solar | 1.0 MW | A2B Development LLC dba Mars Energy Development |
Merced County, California has 29 power plants totaling 1,036 MW of nameplate capacity. Hydroelectric is the dominant fuel source at 44% of installed capacity, followed by Solar (35%) and Wind (15%). The largest facility is W R Gianelli at 424 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.
To find plants closer to a specific address in Merced County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.